BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Crossfield, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

BF 81919 carries Township Road 281A over a tributary to Dogpound Creek, near Bottrel. The crossing provides the only access to local residents and livestock operations along this dead-end road. The replacement structure will be a 2.2 m CSP culvert on a similar alignment to that of the existing structure, with some alterations to the gravel road’s vertical alignment. Specifics beyond this have not been determined at this time and no drawings are available yet. The construction completion date will be October 31, 2024. BF 8668, carries TR 274 over a tributary to nose Creek near Airdrie. The crossing provides access to local residents, in addition to serving as a larger connector route between rural communities spanning from Irricana to Highway 766. The replacement structure is expected to be a 2.0 m diameter CSP culvert along a new alignment. The construction completion date will be October 31, 2024. BF 81912 carries TR 282 over a drainage near Madden. The crossing provides access to Highway 772 for a number of local landowners and agricultural facilities. The replacement structure is expected to be a non-bridge-sized CSP culvert (< 1.2 m diameter) though this structure is not confirmed at this point in time. The construction completion date will be October 31, 2024. BF 13177 carries TR 264 over a tributary to Crossfield Creek, near Kathryn. The crossing provides access throughout the northeast portion of the county. The replacement structure is expected to be a polymer-laminated 2.4 m CSP culvert complete with substrate and holders. The construction completion date will be October 31, 2024. It is anticipated that BF 81912 will be tendered with BF 8668 due to the close vicinity. All other sites are anticipated to be tendered separately. Question Deadline 03/15/2024 at 2:00 PM MT

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
12
Bidding Soon
314
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

August 1, 2024

img_map_placeholder

Multiple Locations, Crossfield, AB


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.