Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Mountain Village, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
SCOPE OF WORK: Provide materials, equipment, and labor to resurface and shoulder: San Joaquin Road from Prospect Creek Drive to Tristant Drive and Mountain Village Blvd from Lost Creek Lane to Country Club Drive with a 2" asphalt overlay. Granit Ridge with a 1 14" overlay. ADDITIONAL REQUIREMENTS: Approximately 3305 LF of road 22' wide with a 2" asphalt overlay and 1010 LF of road 14' wide with 1 14" asphalt overlay. Prospective contractors will be responsible for measurement of roads to be resurfaced and offer a fixed bid price for the entire project. Shouldering shall be included for all sections of roads that do not have curb and gutter. A separate price for the overlay of each road should also be itemized in the bid. A pre-bid site walk will be required to view the sections of roads to be resurfaced and make the necessary measurements. (See proposed deadline section below for dates and times) The asphalt mix design shall meet Colorado Department of Transportation (CDOT) standards for SX 75 PG 58-28 with 20% RAP. Warm mix will be required. The overlay course shall be placed so as to remove irregularities such as wheel ruts and reestablish the crown (2%) as needed. Pavement shall be compacted by rolling with both steel drum and pneumatic tire rollers. Compaction must be in a train like fashion with first a steel drum break down roller followed by an intermediate rubber tire roller and finally by a steel drum finish roller. Pavement shall be compacted to a density of 92-96 percent of the daily theoretical maximum specific gravity determined according to CP51 of CDOT specifications. Quality control testing of compaction density to be performed by contractor and results provided to TMV daily. Frequency of testing to be discussed during site walk. All necessary grinding of asphalt surfaces required to match up to existing surfaces will be performed by the contractor. The grindings are to be stockpiled on site to be used for shouldering. To be discussed during site walk. New shoulder material shall be %" road base spread 2ft wide from edge of pavement and compacted. Cleaning and surface prep before application shall be the responsibility of TMV. Traffic control shall be the responsibility of TMV. A project work schedule shall be submitted by the contractor with the RFP package. It is anticipated that construction will be a Monday - Saturday schedule with Sundays as a special approval case only. Water will be provided by TMV. All staging will be on site. All permits will be the responsibility of the TMV. Proof of insurance shall be provided by the contractor to the Town prior to commencement of work, showing the Town as additional insured, in a minimum amount of $2,000,000 per occurrence. A current business license will be required before work can commence. Once the project has started the contractor must complete the project without pulling off the job unless approved by Town of Mountain Village. Violation of this requirement will result in penalties assest at the end of the project. Blackout no work dates due to festivals: June 19-24 Bluegrass July 4-7 Fourth of July For more information call or email: Finn Kjome 970-729-3441 fkjome@mtnvillage.org
Award
Roads / Highways
$313,700.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2024
June 10, 2024
Multiple Locations, Mountain Village, CO
Related To This Project
Mountain Village, CO
Bid Date: Mar 28 2024
Mountain Village, CO
Bid Date: Apr 16 2024
Mountain Village, CO
Bid Date: Aug 28 2024
Mountain Village, CO
Bid Date: Sep 12 2024
Mountain Village, CO
Bid Date: Oct 11 2024
Mountain Village, CO
--
Mountain Village, CO
--
Mountain Village, CO
--
Mountain Village, CO
Bid Date: Feb 24 2022
Mountain Village, CO
--
Mountain Village, CO
Bid Date: Oct 01 2019
Mountain Village, CO
Bid Date: May 02 2023
Mountain Village, CO
Bid Date: Mar 23 2023
Mountain Village, CO
Bid Date: Mar 08 2023
Mountain Village, CO
Bid Date: Feb 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.