BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 25, 2024 at 8:00 PM

Updated May 26, 2024

Site work and paving for a mixed-use development in Morenci, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed project is located in Graham County on US 191, from Milepost (MP) 117.33, to MP 121.03, south of US 70 in Safford. The work consists of pavement rehabilitation. The work includes milling the existing asphaltic concrete and replacing it with new asphaltic concrete and a fog coat, grading roadway for pavement, removing and reconstructing sidewalk ramps, pavement marking, and other related work. Bid Opening: 4/12/2024 11:00:00 AM Engineering Specialist: Jesmin Farhana Pre-Qualification: Yes AZDOT - Pavement Rehabilitation - US 191 Question Deadline 04/09/2024.

Award

Roads / Highways

$6,559,900.00

Public - State/Provincial

Paving, Site Work

31

3

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
46
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.