Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a fire / police facility in Watertown, Wisconsin. Completed plans call for the construction of a 31,395-square-foot fire / police facility; and for site work for a fire / police facility.
The City of Watertown hereby gives notice that sealed bids will be received at the office of the Watertown Finance Department for the following Bid Packages: BID PACKAGE DESCRIPTION #01 Site Work/Site Utilities #02 Asphalt #03 Cast-in-Place Concrete #04 Masonry #05 Structural Steel/Misc. Steel (Furnish Only) #06 Steel Erection & Misc. Metals Installation #07 General Construction #08 Roofing and Siding #09 Overhead Doors #10 Storefronts/Interior and Exterior Windows #11 Metal Studs & Drywall #12 Flooring/Tile #13 Resinous Flooring #14 Ceilings #15 Painting #16 Elevator #17 Fire Protection #18 Plumbing #19 HVAC #20 Electrical/Communications/Electronic Safety & Security #21 Metal Pole Building (alternate) PROJECT - New Fire Station The work is for a new 31,395 SF Fire Station to be located at 621 Bernard Street, Watertown WI 53094. All project questions shall be addressed through Maas Brothers Construction. The main contact for this project is Trevor Kearns. All questions shall be emailed to tkearns@maasbros.com. All bids shall be addressed to; the Finance Department, 106 Jones Street, Watertown WI 53094. Bids shall be sealed and shall have the name and address of the Bidder, the Bid Package Number and Name and the City of Watertown Project Name for which the bid is being submitted. PROJECT AWARD - Project Award is scheduled for consideration by the City Council at their April 2, 2024 at their 7:00 P.M. meeting. All Bidding Contractors using electronic documents are responsible for the viewing/downloading of the correct documents for the purpose of providing a sufficient bid. As holders of these documents, Bidding Contractors are acknowledging their responsibility to obtain any addenda or other materials prior to submitting Bid for the project. Because the Owner, Short Elliott Hendrickson (SEH), and Maas Brothers Construction have no control over the means of printing of these documents, the Bidding Contractor(s) accept the responsibility of verifying that they have all project bidding documents and that they have been printed correctly. The Bidding Documents will also be on file February 26, 2024 for review and inspection at the offices of Maas Bros. Construction Co., Inc., 410 Water Tower Ct., Watertown, WI 53094. BID SECURITY - No bid shall be received unless accompanied by a certified check or satisfactory bid bond payable to the City of Watertown in an amount not less than 5% of the maximum bid as a guarantee that, if the bid is accepted, the Bidder will execute and file the contract, performance/payment bonds and insurance certification, as required by the contract documents, within ten (10) days after the Notice of Award. BID REJECTION - The OWNER reserves the right to reject any and all bids, waive any informalities in bidding or to accept the bid or bids which best serves the interests of the City of Watertown. WITHDRAWAL OF BIDS - No bid shall be withdrawn for a period of 60-days after the scheduled opening without the consent of the OWNER.
Post-Bid
Fire / Police
$14,918,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2024
April 22, 2024
621 Bernard St, Watertown, WI
Related To This Project
Watertown, WI
Bid Date: May 13 2024
Watertown, WI
Bid Date: Jun 12 2024
Watertown, WI
Bid Date: Jun 25 2024
Watertown, WI
--
Watertown, WI
--
Watertown, WI
--
Watertown, WI
--
Watertown, WI
Bid Date: Nov 12 2024
Watertown, WI
Bid Date: Mar 13 2024
Watertown, WI
Bid Date: Feb 27 2024
Watertown, WI
Bid Date: Mar 12 2024
Watertown, WI
Bid Date: Mar 12 2024
Watertown, WI
Bid Date: Feb 20 2024
Watertown, WI
Bid Date: Feb 16 2024
Watertown, WI
Bid Date: Feb 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.