EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Benton, Tennessee. Completed plans call for site work for a water / sewer project.

The City of Benton will receive separate sealed Bids for furnishing of all materials, labor, tools, equipment, and appliances necessary for the "2023 Benton ARP Water System Improvements" project at the Benton City Hall located at 6496 Hwy 411 North, Benton, TN 37307. Question Deadline 03/21/2024 Every request for such interpretation should be in writing addressed to John King, P.E., jking@ctiengr.com; CTI Engineers, Inc., at 112 Durwood Road, Suite A, Knoxville, TN 37922, and to be given consideration must be received at least five days prior to the date fixed for the opening of Bids. Contact John King, P.E., (865-246-2750, jking@ctiengr.com), with questions regarding the project. The Project consists of the following major elements: Installation of approximately 10,700 LF of 6-inch and 2-inch waterline including services and service lines and other appurtenances as included within the project. Contractors are required to comply with TCA 62-6-119 as outlined in the Information to Bidders. No bid may be withdrawn within 60 days after the scheduled time for receipt of bids. A mandatory pre-bid meeting will not be held. However, Contractors are recommended to perform a pre-bid site visit to become familiar with the areas of work Bids will only be accepted from Contractor's that are listed on Engineer's list of planholders who have purchased the Contract Documents and Specifications. Contact John King, P.E., (865-246-2750, jking@ctiengr.com), with questions regarding the project. The City of Benton reserves the right to waive informalities and to reject any and all bids. It is the policy of the City of Benton to ensure compliance with Title VI of the Civil Rights Act of 1964; 49 CFR, Part 21; related statutes and regulations to that end that no person shall be excluded from participation in or be denied benefits of or be subjected to discrimination under any program or activity receiving Federal financial assistance or any other funding source on the grounds of race, color, sex, national origin, or ancestry.

Bid Results

Water / Sewer

$1,115,793.00

Public - City

Site Work

15

12

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Backhoes
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
55
Bidding Soon
765
All Active Projects
348
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 25, 2024

img_map_placeholder

Multiple Locations, Benton, TN


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Benton ARP Water System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.