BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Des Moines, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Bill Riley Trail Resurfacing from Ashworth Pool to Gray's Lake, 112023010 The improvement includes excavation, milling, overlay, Hot Mix Asphalt (HMA) paving, Portland Cement Concrete (PCC) patching, PCC curb and gutter, storm sewer, intakes, pavement markings, traffic control, restoration, seeding, and miscellaneous associated work to complete the project, all in accordance with the contract documents including Plan File No. 662-185/217 located along the Walnut Creek Trail, the Bill Riley Trail, American Discovery Trail, and other locations as directed by the City Engineer in Des Moines, Iowa This project shall be fully completed October 4, 2024 and in accordance with Completion Provisions. Engineer's Construction Estimate. $970,000.00 The City of Des Moines (Jurisdiction) reserves the right to reject any and all bids.

Award

Roads / Highways

$888,888.00

Public - City

Paving, Site Work

35

4

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
52
Bidding Soon
973
All Active Projects
348
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 2, 2024

May 2, 2024

October 4, 2024

img_map_placeholder

Bill Riley Trail, Des Moines, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.