Renovation of a municipal facility in Saint Paul, Minnesota. Completed plans call for the renovation of a municipal facility.

The work will be done under one prime contract that includes: General, Mechanical, and Asbesto's Abatement. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Work includes but is not limited to: CMU and metal stud/drywall partitions, hollow metal frames and hollow metal doors, access doors, and floor, wall and ceiling finishes. 2. Mechanical includes heating loop removal of dead legs and repair. 3. Site investigations and coordination drawings to verify scope and areas of work. 4. Demolition as required to install new work.The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Site Directions: Transportation Building - Capital Complex 395 John Ireland Blvd. Saint Paul, MN 55155 Question Deadline: 03/18/2024, All questions should be submitted , The State is not obligated to answer questions submitted after the question due date and time. Est. Value: $ 522,744.00 Question Deadline 03/18/2024 Est. Completion Date: Sept. 30, 2024 This project has a Enter TG/ED/VO Subcontracting Goal 8% Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned (VO) Small Business (TG/ED/VO) subcontracting goals established. Targeted Group, Economically Disadvantaged, and Veteran-Owned small businesses that can be used to meet subcontracting goals MUST be certified by the Department of Administration, Office of State Procurement at the time of the subcontractor's work on the construction project. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor, the work for at least 3 contracts which have achieved Substantial Completion by January 1, 2024, for a minimum of 3 years for construction of mechanical upgrades in a secured public facility while fully occupied. Each of these contracts MUST have had a construction value of $250,000 or greater.

Award

Municipal

$426,300.00

Public - State/Provincial

Renovation

16

19

2

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
802
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

April 29, 2024

img_map_placeholder

395 John Ireland Blvd, Saint Paul, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.