Site work and paving for a mixed-use development in Upland, California. Conceptual plans call for site work for a service station / car wash facility; for paving for a service station / car wash facility; water / sewer project; and water / sewer project.

Questions regarding this Request for Proposals or requests for additional background information may be directed to: Kirk Swanner, Associate Engineer Phone: (909) 291-2938 Fax: (909) 291-2974 E-Mail: kswanner@uplandca.gov Anticipated City Review of Proposals Received March 21-27, 2024 Consultant Interviews (If Necessary) March 28, 2024 Notice to Proceed April 16, 2024 The purpose of this solicitation is to obtain the services of a licensed land surveying firm to provide design survey services for the Foothill Blvd. Rehabilitation and Water Improvements project. The improvements proposed under this project consist primarily of rehabilitation of street pavement including frontage roads and installation of potable water mains with associated appurtenances. Anticipated construction contract work shall include: 1. Street Improvements: Reconstruction of failed localized pavement areas; coldplaning 2" of existing A.C. pavement; construction of AC base course; overlaying 2" of Asphalt Rubber Hot Mix (ARHM); adjustment of manholes and utility valve covers to grade; replacement of traffic striping, pavement markings; and installation of inductive loop detectors and/or video detection system; 2. Concrete Improvements: Reconstruction of displaced curb, gutter, sidewalk, driveway approaches, cross gutters, spandrels, etc.; construction of curb, gutter, cross gutters, spandrels, etc. where needed; and installation of new and/or modifications of existing curb ramps to current ADA standards; 3. Water Improvements: Upgrading existing fire hydrants, installation of new water mains, service laterals, water valves, and upgrading existing water main crossings from side streets and alleys. A. Utility Research The Surveyor is required to research and notify all utilities within the project area, including but not limited to water, sewer, storm drain, traffic signal facilities, electrical, telephone, gas, cable television, etc. Utility as-built plans will need to be obtained and cross-referenced with field locations so that all utilities are accurately shown on the topographic map. The Surveyor will be required to provide copies of all utility plans received from respective agencies to the City. The City will provide all available City-owned facility records at no cost to the Surveyor. B. Topographic Survey The survey limits for the anticipated improvements described above are shown on the attached map. The city's vertical and horizontal datum shall be used, and survey control for future construction shall be set. This is a roadway and utility improvement project that generally requires detailed design surveys as described below, for the length of roadway shown on said map. The surveyor will be expected to perform an adequate topographic survey for the preparation of a complete and accurate set of improvement plans and specifications to be designed by the City of Upland. The topographic survey will need to locate all of the areas of inadequate flow so that positive drainage can be re-established. The survey shall include, but not necessarily be limited to, the following: 1. Establishing horizontal and vertical control that will serve as the framework of the survey. 2. Locating right-of-way boundaries, as well as fence and wall lines. 3. Locating all visible features such as high points, low points, curbs and gutters, concrete cross gutters, driveways, sidewalks, mail boxes, trees, utility lines, utility boxes, power poles, guy wires, signing, striping, and all other existing topographical features within the public right-of-way. 4. Determining enough horizontal location and elevation points (usually called side shots) of concrete flow line to provide enough data for plotting profile, as well as determining limits of concrete repairs and concrete construction. 5. Locating the street center line and mark stations on curbs or curb line projections on both sides at 100-foot intervals. 6. Determining elevations along and across the center line for plotting profile and cross sections. The survey shall include full sections at 100-foot minimum intervals from 10' north of the north ROW line, to 10' south of the south ROW line. Intermediate points shall include, but not be limited to, street centerline; front and back of sidewalks; median top of curbs; AC surfaces below median curbs; at lane lines and crown lines; gutter lips and flowlines; top of curbs; medians islands; and at points where abrupt changes in grade occur. Where it is not possible to take shots beyond the ROW line due to obstructions, the last shot shall be taken at the back of the sidewalk. 7. Plotting the center line profile and cross sections using AutoCAD 2020. Existing elevations shall be shown on the drawings in parentheses. 8. Plot the survey data as stated below. C. Base Drawing 1. Plot the survey data obtained above, using AutoCAD program, creating a typical street improvement base drawing. 2. Draw the street's existing centerline and flowlines profiles as well as cross sections. 3. Affix existing elevations (in parentheses) in the plotted profiles and cross sections. 4. Submit a printed set of the drawing and an electronic copy of the CAD file to the City of Upland. The file must be compatible with the City's AutoCAD version 2020 software. Upon request, the City will provide all available street plans, maps and records, including bench marks, to the Surveyor at no cost. This shall in no way relieve the Surveyor from conducting his or her own research of available record drawings. Deliverables will include the complete design survey data and construction base drawing with all features labeled, spot elevations shown in plan view of TC, FL and BW, survey control shown, and street/cross streets shown, including dimensions, in both hard copy and digital AutoCAD format (most current version). Other data to be submitted, when requested, will include and ASCII point file.

Conceptual

Service Station / Car Wash

$1,800,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
103
Bidding Soon
2,220
All Active Projects
996
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.