EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Burton, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000344548 Question Acceptance Deadline 04/08/2024 09:30 AM EDT Questions are submitted online No, General questions may be addressed by emailing questions to Peter Wingblad at p.wingblad@burtnomi.gov. Bids Are Solicited Under a General Contract for the Following Approximate Quantities of Work: 1. 1 Ls Traffic Control 2. 111,000 Sy Seal, Single Chip 3. 111,000 Sy Micro-surface, Single Cse 4. 7.3 Mile Overband Crack Seal Local Street 5. 11.6 Lm Overband Crack Seal Major Street Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % Each proposal submitted to the Owner shall be accompanied by a Proposal Guarantee in the form of a certified check, cashier's check, money order or bid bond in an amount not less than 5% of the total base bid. No bid shall be withdrawn after the opening of proposals without the consent of the Owner for a period of ten (10) days after the bid closing. The right is reserved by the Owner to waive any informality in bids, to reject any or all bids, or accept any bid or combination of bids, which is considered most favorable to the Owner. The Owner may also adjust any work item quantities without adjustment of the bid unit price. LOCAL STREET SUBDIVISIONS - LAPEER HEIGHTS, MAPLE LAWN, MAPLEWOOD MEADOWS, CITY GARDENS AND COUNTRY GARDENS LOCAL STREETS - RINN, CARLSON AND BRABBS. MAJOR STREET - CENTER ROAD, MAPLE AVENUE, FENTON ROAD Work shall progress as follows: -Apply HMA Crack Fill Treatment (Overband Crack Fill, Roadbed) IAW Section 502. Use material IAW section 502.02.B.2. Apply in preparation for Single course Chip Seal (Seal, Single Chip). -Allow a minimum of 7 days between HMA Crack Treatment and Chip Seal treatment. -Apply Chip Seal to the full width of the roadway IAW Section 505. -Apply in preparation for Micro-Surface (Micro-Surface, Single CSE). -Allow a minimum of 48 hours between Chip Seal treatments and MicroSurface. -Apply Micro-Surface to the full width of roadway IAW Section 504. Surface treatments are to be applied to: LAPEER HEIGHTS SUBN, as directed by the Department. MAPLE LAWN SUBN, as directed by the Department. RINN STREET, as directed by the Department. CARLSON STREET, as directed by the Department. BRABBS STREET, as directed by the Department. CITY & COUNTRY GARDENS SUBN, as directed by Department.

Award

Roads / Highways

$886,135.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
88
Bidding Soon
1,256
All Active Projects
442
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Burton, MI

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.