BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2024 at 7:00 PM

Updated March 7, 2024

This is a service / maintenance or supply contract in Telluride, Colorado. Contact the soliciting agency for additional information.

Contractor warrants that it is fully qualified to perform the below-described Services and shall perform the Services following generally recognized professional practices and standards of Contractor’s profession, to the reasonable satisfaction of the County, and in strict accordance with the provisions of the Contract Documents. No adjustment or modification of the Contract Documents shall be allowed for any misunderstanding of the Services or of the terms and provisions contained in the Contract Documents. Services shall include: construction design of the Lawson Hill Trail connector from the intersection of CO Highway 145 to the County Interceptor Lot including coordination with and to the standards of the Colorado Department of Transportation. The project scope includes the design and construction of a 10’ wide shared use path from the existing pedestrian underpass beneath SH 145 along Society Drive to the Lawson Hill Park and Ride. The path will run along the north/west side of Society Drive from US145 ending at an access road to an existing gymnastic facility. The path is proposed to be asphalt or concrete depending on costs. Inquiries or questions on the contents and requirements of the RFQ will be accepted in written electronic form only. “Questions on Lawson Hill Trail Project (#26003 )”. The deadline for inquiries is Tuesday, March 12th at 3:00 PM Mountain Standard Time, after which time no further inquiries will be addressed. The method of Contractor Selection has not been Determined at this time

Conceptual

Roads / Highways

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
76
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

Project location map

Multiple Locations, Telluride, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.