Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Hot Springs National Park, Arkansas. Completed plans call for site work for a water / sewer project.
A performance and payment bond written by a responsible surety company authorized to do business in Arkansas, in the amount of the contract, will be required on all contracts in excess of $20,000. Bid security in the form of a cashier s check only (relative to other types of checks), drawn on a bank or trust company doing business in Arkansas, or a corporate bid bond in favor of the Westwood Village Sewer Facilities Board and in the amount of five percent (5%) of the bid amount is required on bids exceeding $20,000 and must be submitted with the bid. Bids may not be withdrawn within 90 days of opening. Bidders must provide with their bid a certificate regarding Equal Employment Opportunity, as applicable. The contractor must comply with Davis Bacon wage rates, all laws, regulations, directives and rules. The contracting party shall not discriminate on the basis of race, sex, color, national origin, gender, sexual orientation, gender identity or disability. Qualified (conditional) bids will be subject to rejection. Bidders are expected to inspect the work site and inform themselves of local conditions. Bidders must be prepared, if requested by the Owner, to submit additional information such that the Owner can determine responsibleness. The Owner encourages the participation of disadvantaged, small, minority, and woman owned business enterprises in the procurement of goods, services, and construction, either as contractor or subcontractor. Certification by a government agency is required for recognition as such an entity. The Owner reserves the right to reject any or all bids, to waive any formalities and to, in the opinion of the Owner accept the bid that is in the Owner s best interest. Deactivating one pump station, installing a duplex grinder pump and electrical service, 17,735 linear feet of 3 sewer force main with air relief valves, remove 15 vertical feet of cast in place manholes, install 25 vertical feet of pre-cast manholes, repair 4 manholes for leaks at inlet 6 PVC, remove and replace 4,400 feet of 6 PVC gravity sewer line, remove and replace 2,700 linear feet of 4 service line, remove and replace fences driveway repair and street repair.
Post-Bid
Water / Sewer
$1,700,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2024
May 27, 2024
Multiple Locations, Hot Springs National Park, AR
Related To This Project
Hot Springs National Park, AR
--
Hot Springs National Park, AR
Bid Date: Oct 01 2024
Hot Springs National Park, AR
--
Hot Springs National Park, AR
Bid Date: Apr 29 2024
Hot Springs National Park, AR
Bid Date: May 06 2024
Hot Springs National Park, AR
Bid Date: Apr 22 2024
Hot Springs National Park, AR
Bid Date: Apr 29 2024
Hot Springs National Park, AR
Bid Date: May 06 2024
Hot Springs National Park, AR
Bid Date: Apr 22 2024
Hot Springs National Park, AR
Bid Date: Apr 01 2024
Hot Springs National Park, AR
Bid Date: Mar 28 2024
Hot Springs National Park, AR
Bid Date: Apr 01 2024
Hot Springs National Park, AR
Bid Date: Mar 28 2024
Hot Springs National Park, AR
Bid Date: Mar 21 2024
Hot Springs National Park, AR
Bid Date: Jun 28 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.