Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 2, 2025 at 8:00 PM
Updated September 3, 2025
Site work and paving for a sidewalk / parking lot in Chesapeake, Virginia. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
UPDATE : Smart22 Western Branch Rails to Trails Phase 2 Facilities for Pedestrians and Bicycles Description FROM: Gum Road TO: Taylor Rd. Project is in Virginia Department of Transportation (VDOT capital budget fy 2026-2031 CIP _______________________________________________________________________________________ This is a VDOT-funded project. Phase 2 of the Western Branch Trail project will fund construction of a 10-foot-wide multi-use path connecting the completed Phase I portion of the project to the future Phase III of the project (Taylor Rd to Suffolk Line). The project limits are from Dordon Street to Taylor Road. The multi-use trail consists of a single ten-foot wide asphalt surface. The existing railroad ballast will be stabilized and the asphalt surface will be constructed directly on top. Safety amenities include benches, bike racks, tire pumping/bicycle repair stations and kiosks. Gravel shoulders and landscape barriers will provide additional safety to bicyclists. Connection to Peppercorn Drive and Arboretum Trail will allow for neighborhood access. This project is included in the city’s 2024-2028 Capital Improvement Plan. As of March 20, 2024, project design is scheduled to be completed in Winter 2024. Bidding process is to start in Spring 2024 and construction starting in Summer 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Sidewalks / Parking Lot
$1,847,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2028
Taylor Rd & Dordon St, Chesapeake, VA
Related To This Project
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
Bid Date: Apr 03 2024
Chesapeake, VA
Bid Date: Aug 20 2020
Chesapeake, VA
Bid Date: Mar 29 2024
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
Bid Date: Apr 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
