BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Site work and paving for a sidewalk / parking lot in Chesapeake, Virginia. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

UPDATE : Smart22 Western Branch Rails to Trails Phase 2 Facilities for Pedestrians and Bicycles Description FROM: Gum Road TO: Taylor Rd. Project is in Virginia Department of Transportation (VDOT capital budget fy 2026-2031 CIP _______________________________________________________________________________________ This is a VDOT-funded project. Phase 2 of the Western Branch Trail project will fund construction of a 10-foot-wide multi-use path connecting the completed Phase I portion of the project to the future Phase III of the project (Taylor Rd to Suffolk Line). The project limits are from Dordon Street to Taylor Road. The multi-use trail consists of a single ten-foot wide asphalt surface. The existing railroad ballast will be stabilized and the asphalt surface will be constructed directly on top. Safety amenities include benches, bike racks, tire pumping/bicycle repair stations and kiosks. Gravel shoulders and landscape barriers will provide additional safety to bicyclists. Connection to Peppercorn Drive and Arboretum Trail will allow for neighborhood access. This project is included in the city’s 2024-2028 Capital Improvement Plan. As of March 20, 2024, project design is scheduled to be completed in Winter 2024. Bidding process is to start in Spring 2024 and construction starting in Summer 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Sidewalks / Parking Lot

$1,847,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
83
Bidding Soon
1,173
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2028

Project location map

Taylor Rd & Dordon St, Chesapeake, VA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.