Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Fillmore, California. Completed plans call for site work for a playground / park / athletic field.
Bids will not be accepted if a Contractor has not been prequalified where prequalification is required. The Contract Time is 180 days. If this Project includes work that will be performed by mechanical, electrical or plumbing ("MEP") subcontractors (contractors that hold C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses), such MEP subcontractors must also be prequalified. A list of prequalified MEP subcontractors will be made available by the District to all bidders at least five business days prior to the bid opening date. It is the responsibility of the bidder to ensure that all MEP subcontractors holding any of the licenses listed above are properly prequalified before submitting a bid. This prequalification requirement applies even if the subcontractor will perform, or is designated to perform, work that does not require one of the licenses listed above, but the subcontractor holds one of the licenses listed above. Each bidder's bid must be accompanied by one of the following forms of bidder's security: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure section 995.120, made payable to the District in the form set forth in the Contract Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds, insurance certificates and any other required documents. In the event of failure to enter into said Contract or provide the necessary documents, said security will be forfeited. Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. No telephone or facsimile machine will be available to bidders on the District premises at any time. It is each bidder's sole responsibility to ensure its bid is timely delivered and received at the location designated as specified above. Any bid received at the designated location after the scheduled closing time for receipt of bids shall be returned to the bidder unopened. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. Each request for clarification shall be submitted in writing, via email, to only the following persons: TO: RJ Stump, Manager, Bond/Facilities Projects / r.j.stump@fillmoreusd.org CC: Lynn Cole, Office Manager / lcole@fillmoreusd.org Pre-bid clarification request shall be filed a minimum of six (6) days prior to bid opening. Final Submission of RFI Tuesday, July 26, 2024 @ 2:00 PM
Award
Playgrounds / Parks / Athletic Fields
$3,841,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 6, 2024
September 5, 2024
615 Shiells Dr, Fillmore, CA
Related To This Project
Fillmore, CA
Bid Date: Apr 11 2024
Fillmore, CA
Bid Date: Apr 25 2024
Fillmore, CA
Bid Date: May 16 2024
Fillmore, CA
Bid Date: May 15 2024
Fillmore, CA
Bid Date: May 15 2024
Fillmore, CA
Bid Date: Jun 04 2024
Fillmore, CA
Bid Date: Aug 08 2024
Fillmore, CA
Bid Date: May 30 2024
Fillmore, CA
Bid Date: Apr 09 2024
Fillmore, CA
Bid Date: Feb 01 2024
Fillmore, CA
Bid Date: Jan 11 2024
Fillmore, CA
Bid Date: Jan 04 2024
Fillmore, CA
--
Fillmore, CA
Bid Date: Jan 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.