BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2024 at 8:00 PM

Updated May 6, 2024

Renovation of a water / sewer project in Lafayette, Wisconsin. Completed plans call for the renovation of a water / sewer project.

All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. Base Bid will be received for: A single lump sum bid for All Work Bid Guarantee in the amount of 10% ofthe Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23,2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23,2017. This change does not affect the Federal Davis Bacon Act requirements. In general, the work consists of: the removal and replacement of an existing underground storage tank (UST) with a new aboveground storage tank (AST). Work will include the construction of a new fueling/dispenser island, spill containment pad, oil/water separator, relocation of an existing monitoring system, and reconstruction/repair of concrete pavements around the perimeter of the work area.

Bid Results

Water / Sewer

$478,325.00

Public - State/Provincial

Renovation

14

17

7

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
47
Bidding Soon
720
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

June 3, 2024

Project location map

E H St, Lafayette, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.