Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Charlottesville, Virginia. Completed plans call for the renovation of a educational facility.
As of April 16,2024, project was awarded to Factory Direct Foodservice , but awarded amount is not available. The estimated construction cost range for this project is $75K-$150K. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A Bid Bond is required for any bid which exceeds $100,000. The "Time for Completion" will be as detailed in the Bid Form. Contractor registration in accordance with Title 54.1, Chapter 11, of the Code of Virginia, is required. See the Instructions to Bidders for additional qualification requirements. The Invitation for Bids for the above project, including the drawings and the specifications prepared by Lane Marketing Group and containing the information necessary for bidding, may be downloaded online from the Albemarle County Procurement web site The County of Albemarle does not discriminate on the basis of race, religion, color, sex, national origin, age or disability, or against faith-based organizations as defined under the Virginia Public Procurement Act on the basis of such organization's religious or charitable character. TIME FOR COMPLETION: (a) "Time for Completion" shall be designated by the Owner on the Invitation for Bids or other prebid documents and shall mean the number of consecutive calendar days following the issuance of the Notice to Proceed which the Contractor has to substantially complete all Work required by the Contract. In some instances, the Time for Completion may be stated in the form of a Contract Completion Date based on a stipulated date of Notice to Proceed. Unless otherwise specified, the Contractor shall achieve Final Completion within thirty (30) days after the date of Substantial Completion. (b) When the Notice to Proceed is issued, it will state a Contract Completion Date, which has been set by the Owner based on date of the Notice to Proceed and the Time for Completion. (c) The Contractor, in preparing and submitting his bid, is required to take into consideration normal weather conditions. No additional compensation will be paid to the Contractor because of adverse weather conditions; however, an extension of time for abnormal weather will be considered by the Owner as indicated in the General Conditions. The undersigned understands that time is of the essence and agrees that the date for Substantial Completion of the entire project shall be on or before August 2,2024 based on a Notice authorizing Work to proceed on or before May 1, 2024 , with construction to begin on site June 8, 2024, and Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion as determined by the A/E.
Award
Educational
$150,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2024
May 1, 2024
3201 Berkmar Dr, Charlottesville, VA
Related To This Project
Charlottesville, VA
--
Charlottesville, VA
--
Charlottesville, VA
--
Charlottesville, VA
Bid Date: Apr 02 2024
Charlottesville, VA
Bid Date: Jul 01 2024
Charlottesville, VA
Bid Date: Apr 02 2024
Charlottesville, VA
Bid Date: Apr 01 2024
Charlottesville, VA
Bid Date: Mar 20 2024
Charlottesville, VA
Bid Date: Apr 03 2024
Charlottesville, VA
Bid Date: Mar 28 2024
Charlottesville, VA
--
Charlottesville, VA
--
Charlottesville, VA
Bid Date: Mar 08 2024
Charlottesville, VA
Bid Date: Mar 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.