Renovation of an educational facility in Charlottesville, Virginia. Completed plans call for the renovation of a educational facility.

As of April 16,2024, project was awarded to Factory Direct Foodservice , but awarded amount is not available. The estimated construction cost range for this project is $75K-$150K. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A Bid Bond is required for any bid which exceeds $100,000. The "Time for Completion" will be as detailed in the Bid Form. Contractor registration in accordance with Title 54.1, Chapter 11, of the Code of Virginia, is required. See the Instructions to Bidders for additional qualification requirements. The Invitation for Bids for the above project, including the drawings and the specifications prepared by Lane Marketing Group and containing the information necessary for bidding, may be downloaded online from the Albemarle County Procurement web site The County of Albemarle does not discriminate on the basis of race, religion, color, sex, national origin, age or disability, or against faith-based organizations as defined under the Virginia Public Procurement Act on the basis of such organization's religious or charitable character. TIME FOR COMPLETION: (a) "Time for Completion" shall be designated by the Owner on the Invitation for Bids or other prebid documents and shall mean the number of consecutive calendar days following the issuance of the Notice to Proceed which the Contractor has to substantially complete all Work required by the Contract. In some instances, the Time for Completion may be stated in the form of a Contract Completion Date based on a stipulated date of Notice to Proceed. Unless otherwise specified, the Contractor shall achieve Final Completion within thirty (30) days after the date of Substantial Completion. (b) When the Notice to Proceed is issued, it will state a Contract Completion Date, which has been set by the Owner based on date of the Notice to Proceed and the Time for Completion. (c) The Contractor, in preparing and submitting his bid, is required to take into consideration normal weather conditions. No additional compensation will be paid to the Contractor because of adverse weather conditions; however, an extension of time for abnormal weather will be considered by the Owner as indicated in the General Conditions. The undersigned understands that time is of the essence and agrees that the date for Substantial Completion of the entire project shall be on or before August 2,2024 based on a Notice authorizing Work to proceed on or before May 1, 2024 , with construction to begin on site June 8, 2024, and Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion as determined by the A/E.

Award

Educational

$150,000.00

Public - County

Renovation

5

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
108
Bidding Soon
1,788
All Active Projects
762
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 28, 2024

May 1, 2024

August 2, 2024

img_map_placeholder

3201 Berkmar Dr, Charlottesville, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.