Site work for a civil project in Prescott, Wisconsin. Completed plans call for site work for a water / sewer project.

**As of April 30, 2024, the project was awarded to Market and Johnson in the Amount of $3,045,000.** The Project includes the following work: Water treatment plant construction including treatment equipment, process piping, electrical, chemical feed equipment, generator, sanitary sewer connection and controls. Bids will be received for a single prime Contract. Bids shall be on a lump sum basis as indicated in the Bid Form. Bids shall be on the forms provided for that purpose and per the Contract Documents prepared by CBS Squared Inc. identified as "Well 3 Water Treatment Plant". No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. Bidder is required to deliver the original certified check or bid bond within 72 hours of the bid opening to CBS Squared, Inc., ATTN: Kristi Lentz, 770 Technology Way, Suite 1A, Chippewa Falls, WI 54729. The certified check or bid bond will be returned to the bidder in accordance with the Instructions to Bidders. The City of Prescott reserves the right to retain the deposits of the three (3) lowest bidders for a period not to exceed 60 days after the date and time set for the opening of bids. Bidders must submit a Bidders Proof of Responsibility in accordance with the Instructions to Bidders. Bidders will be required to provide performance and payment bonds of 100 percent of bid amount. This Contract is expected to be funded in part with funds provided by the Wisconsin Department of Natural Resources, Safe Drinking Water Loan Program (SDWLP). Information on applicable federal requirements is contained in the Project Manual. Use of American Iron & Steel: Projects financed in whole or in part by the Safe Drinking Water Loan Program/Clean Water Fund Program are required to use American iron and steel. Bid proposals may be denied if the requirements of this Section are not met. The successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts which requires that all laborers and mechanics employed by contractors and sub -contractors performing on contracts funded in whole or in part with federal funds in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, as determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area. If the requirements of Davis Bacon, the State of Wisconsin and the Contract requirements conflict with regard to wages, the highest of the three shall apply. The Owner encourages DBEs, MBEs, WBEs, and SBRAs to submit Bid proposals. Equal Opportunity and Affirmative Action requirements apply to this Project. The City of Prescott reserves the right to reject any and all bids, without cause, to waive irregularities and informalities therein and to award the Contract in the best interest of the City of Prescott. Substantial Complete Date: June 1, 2025. Ready for Final Payment Date: June 15, 2025. Question Deadline 03/25/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing Description of the Project: 1. Water treatment plant construction including treatment equipment, process piping, electrical, chemical feed equipment, and controls. 2. Water Treatment Plant includes all work items as described in plans and specifications within the building footprint. 3. Temporary emergency power is required to be provided when the gas engine is removed at Well 3 and until the new emergency generator is operational. 4. Sanitary Sewer connection to main

Award

Water / Sewer

$3,045,000.00

Public - City

Site Work

46

39

31

9

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
82
Bidding Soon
813
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

May 3, 2024

img_map_placeholder

760 Canton St, Prescott, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.