BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Twin Falls, Idaho. Completed plans call for the renovation of a educational facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Work of Project is defined by the Contract Documents and consists of the following: 1. Reroof of Roper Auditorium at Twin Falls High School 2. Hallway (ceiling) improvements at Harrison Elementary School 3. Hallway (ceiling) improvements at Morningside Elementary School 4. Site student parking repaving at Twin Falls High School 5. Site staff parking and entry loop repaving at O'Leary Middle School 6. Support Service Classroom Tenant Improvement at Robert Stuart Middle School 7. Restroom remodel at O'Leary Middle School 8. Exterior doors replacement at O'Leary Middle School. Project Locations: a. Package 1 - John Roper Auditorium, 1615 Filer Ave E. Twin Falls, ID 83301 b. Package 2 - Hallway Improvements at Harrison Elementary School, 600 Harrison Street, Twin Falls, ID 83301 c. Package 3 - Hallway Improvements at Morningside Elementary School, 701 Morningside Drive, Twin Falls, Idaho 83301. d. Package 4 - Site Parking Repaving at Twin Falls High School, 1615 Filer Ave, Twin Falls, ID 83301. e. Package 5 - Site Parking Repaving at O'Leary Middle School, 2350 Elizabeth Blvd, Twin Falls, Idaho, 83301 f. Package 6 - Support Service Classroom Tenant Improvement at Robert Stuart Middle School - 201 Main Avenue W., Twin Falls, Idaho 83301. g. Package 7 - Restroom Remodel at O'Leary Middle School, 2350 Elizabeth Blvd, Twin Falls, Idaho, 83301 h. Package 8 - Exterior Doors Replacement at O'Leary Middle School, 2350 Elizabeth Blvd, Twin Falls, Idaho, 83301 Bp-01 Demolition Bp-02 Rough Carpentry Bp-03 Millwork Bp-04 Glazing Bp-05 Drywall Systems Bp-06 Ceramic Tile Bp-07 Flooring Bp-08 Paint Bp-09 Specialties Bp-10 Fire Sprinklers Bp-11 Plumbing Bp-12 HVAC Bp-13 Electrical Schedule: Work to commence May 23rd and be complete by August 16th for Morningside, Harrison, and Robert Stuart. Work in O'Leary to be complete by September 20th. O'Leary framing and masonry for installation of exterior door to by complete by July 12th.

Post-Bid

Educational

$9,000,000.00

Public - City

Paving, Renovation, Site Work

59

23

7

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
47
All Active Projects
22
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 23, 2024

img_map_placeholder

Multiple Locations, Twin Falls, ID

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.