EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2024 at 8:00 PM

Updated October 1, 2024

Site work for an educational facility in Salisbury, New Brunswick. Completed plans call for site work for a educational facility.

The work under this Contract includes, but is not limited to the following: .1 Removal and disposal of existing asphalt within the areas shown on the Contract Drawings. .2 Removal and disposal of existing base material and fill in locations specified on the Contract Drawings, to a depth necessary to meet final grade elevations as shown on the Contract Drawings. .3 Preparation and grading of Subgrade material in excavated areas and of existing base materials in areas shown on Contract Drawings. Preparation of subgrade to be completed in accordance with Contract Documents and Geotechnical Report. .4 Supply and installation of new base and subbase materials in areas shown on Contract Drawings, including all necessary equipment, labour and materials. .5 Supply and installation of Type D-HF asphalt concrete as per Contract Documents, including all necessary equipment, labour and materials. .6 Installation of swales and drainage ditching as per contract documents including all necessary equipment, labour and materials. .7 Removal and disposal of existing concrete sidewalks as per Contract Documents. .8 Supply and installation of new concrete sidewalks as per Contract Documents. .9 Removal and disposal of existing trees as per Contract Documents. .10 Supply and installation of topsoil and hydro seed to areas where asphalt is removed or existing sod is disturbed/damaged. Topsoil and hydro seed to be applied to meet grades specified on Contract Drawings and match into existing grades and edge of asphalt. .11 Supply and installation of new catch basins, catch basin manholes and storm sewer piping as per Contract Documents, including connection of new storm pipe to existing catch basin and storm pipe. .12 Supply and installation of pavement markings as per Contract Documents. .13 Supply and installation of new signage complete with new Telespar posts and necessary hardware as per Contract Documents. .14 Contractor to supply As-Built drawings to NBDTI Buildings Division upon completion of work. Documents are available through the Construction Association of NB.

Post-Bid

Educational

$500,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Topsoil Placement and Grading, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
26
Bidding Soon
236
All Active Projects
85
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

May 3, 2024

img_map_placeholder

2646 River Rd, Salisbury, NB


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Site Improvements-Phase II-JMA Armstrong and Salisbury Middle

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.