BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Wellington, Colorado. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; road / highway; for paving for a road / highway; and water / sewer project.

**As of September 12, 2024 project was awarded to Connell Resources, Inc. but awarded amount is not available.** Reference Number 0000355979 Delivery Point: Larimer The Larimer Solid Waste Department is planning for the development of the Larimer North Landfill, a new landfill facility to be located at 15669 N. Road 9, Wellington, CO, 80549. This project comprises construction of the initial infrastructure for the landfill. The primary infrastructure components to be developed to support landfill operations consist of a new scale facility (scale house and three (3) scales), a new maintenance building, utilities, roadways, stormwater controls, as well as exterior improvements, including fencing and landscaping. The successful bidder will be required to coordinate all field inspections. All construction shall be done in accordance with all applicable local, state, and federal laws and regulations, Additional summary information on the Contractor's scope of work is in the following paragraphs. The new scale house building (614 square feet) will be double-wythe masonry and have a standing seam metal roof. The interior of the scale house will include an attendant room, unisex restroom, and information technology (IT) room. The scale house will have two (2) secure exterior doors: one (1) that opens to the east and one (1) that opens to the west. Two (2) drive-thru operable windows will be provided for the attendants to process incoming and outgoing customers. The new scale house building will be oriented alongside two (2) inbound scales (790 square feet each) and a single outbound scale (also 790 square feet). There will be a 20- foot-wide lane adjacent to each of the outermost scales for bypassing the scales into or out of the site. The new maintenance building (7,122 square feet building footprint) will be a pre-engineered metal building with an extensive maintenance bay and office space. Three (3) large overhead sectional doors will provide an opening for trucks to enter the three (3) bays inside the building. Two (2) of the bays will each have two (2) overhead sectional doors on opposite sides of the building to allow landfill compactors to pull through the building. The office space will include a break room, men's and women's restrooms with large lockers for storage, a training/conference room, two (2) offices, a mechanical room, an electrical room, an IT room, and additional office storage. Question Deadline 07/09/2024 at 10:00 AM MT Questions are submitted online No, All questions regarding this bid must be emailed to Purchasing Agent Christal Bateman, at batemach@co.larimer.co.us. The schedule for construction is anticipated to begin in the summer of 2024 and is required to be complete by October 1, 2025. The winning bidder is encouraged to order long-lead items within 30 days of the date of the Notice to Proceed. The right is reserved to reject any and all bids or parts thereof.

Award

Municipal

$2,000,000.00

Public - County

New Construction, Paving, Site Work

157

37

68

3

Subscribe For Documents

106 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
99
Bidding Soon
1,374
All Active Projects
579
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 23, 2024

September 23, 2024

October 1, 2025

img_map_placeholder

15669 N County Rd 9, Wellington, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.