BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Wyoming, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This work consists of preparing all lawns and slopes designated for turf restoration on the plans or as directed by the Engineer and hydraulically applying topsoil, fertilizer, and seed, followed by mulch blankets as needed, to those areas. Turf establishment must be in accordance with section 816 of the 2020 MDOT Standard Specifications for Construction and MDOT Standard Plan R-100 Series, except as modified herein or otherwise directed by the Engineer. 2.37 mi of hot mix asphalt cold milling and resurfacing, concrete curb and gutter, curb ramps and pavement markings on Clyde Park Avenue from 44th Street northerly to 36th Street and Kenowa Avenue from 60th Street northerly to I-196 in the city of Wyoming, Kent County. This is a Local Agency project. Net classification required for this project is 2457 Cb Control Sec STU 41000 STU 41000 Job No 216293A 216294A Federal No 24A0299 24A0303 MI DOT - 2404 036 - Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb and Gutter, Curb Ramps and Pavement Markings on Clyde Park Avenue

Award

Roads / Highways

$2,121,944.00

Public - State/Provincial

Paving, Site Work

12

5

7

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
41
Bidding Soon
600
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

June 4, 2024

img_map_placeholder

Clyde Park Ave SW, Wyoming, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.