Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 17, 2024 at 8:00 PM
Updated May 23, 2024
Site work for a civil project in San Pablo, California. Completed plans call for site work for a water / sewer project.
The purpose of the project is to perform an in-line condition assessment of the 18-inch Tara Hills force main. For the inspection equipment to travel through the force main, three plug valves must be removed and replaced with new gate valves or spools at various points on the Tara Hills force main. In addition, to perform the assessment, the installation of the Inspection Tool launch assembly and replacement of 20 feet of ductile iron pipe (DIP) will also be necessary. The equipment, permitting and associated tanks and pumping services are required to support these activities being performed by the primary consultant. There are four shutdowns planned to accomplish this work. The shutdowns will require temporary storage tanks, pumps, piping, and pumping operations at four locations (Tara Hills, Justice Center, Atlas, and Point Pinole) to successfully contain the wastewater in the Tara Hills Force Main system and complete the four shutdowns and project objectives. Question Submission Deadline:May 17, 2024, 4:00pm Question Response Deadline:May 21, 2024, 4:00pm The Board of Directors selected the consultant PICA to perform the assessment. The firm selected by the district to provide "Equipment and associated tanks and pumping services" for this project will be required to work with PICA to support the assessment by providing the directed conditions necessary to launch and retrieve the Inspection Tool. William Silver Project Manager 2910 Hilltop Drive Richmond, CA 94806 Email: wsilver@wcwd.org Phone: (510) 239-9217 The bidder to whom the contract award is made shall, at the time of execution of the Contract, furnish to WCW a Performance Bond and a Payment Bond, executed as surety by a corporation acceptable to WCW and authorized to issue such surety bonds in the State of California. Such bonds shall be substantially in the form included with this solicitation. Such Performance Bond and Payment Bond shall be for one hundred (100) percent of the proposal total as set forth in the Schedule of Bid. The entire cost of these bonds shall be borne by the successful bidder. The WCW Board of Directors reserves the right to reject any or all bids for the work and waive any irregularity in bids received.
GC Bidding
Water / Sewer
$360,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
17
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.