BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Salina, Kansas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Awarded: APAC Kansas, Inc $1,393,163 James K. Coy Construction, INC $410, 511 A Bid security in the amount of five percent (5%) of the bid must accompany each bid in accordance with the construction documents. The bond shall be written on AIA Document A 310 b. A Performance bond shall be written on AIA Document A312. The bonds shall be written as Statutory Bonds in the full amount of the contract and placed on file with the Clerk of the District Court. The Surety Company shall be approved by the United State Treasury Department, licensed by the state of Kansas, and approved for bonding the amount required for the project. The Bidder shall furnish bonds covering the faithful performance of the contract and payment of all obligations arising thereunder. Bonds shall be included with the signed contracts. c. The Owner intends to award the work upon review and approval of the bids received. The successful contractor will be given ten (10) days after notification of the contract award to return the signed contracts with the required bonds and insurance certificates attached thereto Removing existing asphalt parking lot and replace with new curbs and gutter and concrete slab as Base bid #1, Base Bid #2 includes milling and overlay of parking and drives. Base Bid #3 Meadowlark - demo and reconstruct sidewalks, porch, stairs and new ADA ramp with Guard Rails. Bid-Results:- 1. Schilling Base Bid #1- Concrete - Ames Coy Construction- $280,044 2. Schilling Base Bid #2- Full Asphalt- APAC- $ 258,715 3. Heusner Base Bid # 1-Concrete- Ames Coy Construction-$ 130,467 4. Heusner Base Bid # 2-Asphalt Mill- APAC-$60,345 5. Central Base Bid #1- Concrete-APAC-$714,906 6. Central Base Bid #2- Asphalt Mill- APAC-$264,685 7. MLR - Concrete- APAC- $34,167

Award

Sidewalks / Parking Lot

$1,803,674.00

Public - City

Paving, Site Work

9

13

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
166
All Active Projects
74
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 27, 2024

img_map_placeholder

Multiple Locations, Salina, KS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.