BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Benicia, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Location of Work: Rose Dr, Benicia, CA 94510 E 2nd St, Benicia, CA 94510 Park Rd, Benicia, CA 94510 The 2024 Citywide Pavement Rehabilitation Project includes the following scope of work Base Bid o 3 Layer Treatment System consisting of Type II Slurry Seal (top layer), Asphalt Rubber Chip Seal (middle layer), Type III Microsurface (bottom layer) for sections of roadway along Rose Drive between Primose Lane and Panorama Drive. o Grind and replace 6 inches of HMA for sections of roadway along Rose Drive between Primose Lane and Panorama Drive. o Base Failure Repairs of 12 inches in depth for sections of the roadway along Rose Drive between Primrose Lane and Panorama Drive. o Type II Microsurface Treatment along Rose Drive between Panorama Drive and McAllister Drive o Striping of traffic lanes, crosswalks, and bicycle lanes along Rose Drive between Primose Lane and McAllister Drive. o Intersection of Panorama Drive and Rose Drive: Construction of 4 curb extensions with pedestrian accessible curb ramps, replacement of signs, high visibility crosswalks, and re-stripe of all traffic markings. 2024 Citywide Pavement Rehabilitation and HSIP Cycle 11 Pedestrian Crossing Project. The Engineer's Opinion of Probable Costs is approximately Base Bid - $1,200,000, Bid Alt 1 - $1,100,000, Bid Alt 2 - $76,000. The project generally consists pavement rehabilitation (3 layer Treatment system consisting of Type II Slurry (top), asphalt rubber chip (middle), Type II micro (bottom)), grind and replace HMA, base failure repair, utility adjustment, curb extensions, curb ramps, restriping roadway, and sign replacement. The base bid will include work on Rose Drive between McAllister and Primrose. Bid Alt 1 will include work on East 2nd Street from Hillcrest to Rose. Bid Alt 2 will include work on Park Road at Sulphur Creek Springs bridge. The project will be governed by the Contract Documents, including the Caltrans State Standard Specifications, 2023 edition.

Award

Roads / Highways

$1,200,000.00

Public - City

Paving, Site Work

23

12

12

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
86
Bidding Soon
1,938
All Active Projects
789
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

June 10, 2024

img_map_placeholder

Multiple Locations, Benicia, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.