Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2025 at 8:00 PM
Updated July 29, 2025
Site work and paving for a road / highway in Milaca, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
UPDATE :MnDOT will reconstruct and improve two miles of Hwy 23 from the Rum River bridge to Mille Lacs Co. Rd. 2 (105th Ave.) in Milaca. Construction to begin in 2027. Hwy 23 Milaca project map Hwy 23 Milaca intersection accesses: Third Ave. SW (Milaca public schools) - roundabout Central Ave. (Co. Rd. 36) – roundabout First St. E – roundabout SB Hwy 169 – three-quarter NB Hwy 169 – roundabout 10th/110th Ave. SE – three-quarter 105th Ave. (Co. Rd. 2) – roundabout Select map image to enlarge Summary of work Reconstruct the road and update access from east of the Rum River Bridge to 105th Ave. (Mille Lacs Co. Rd. 2), includes adjacent entrances Remove signal and install roundabout at Hwy 23 and Central Ave. S (Mille Lacs Co. Rd. 36) Add new multi-use trail along the entire north side of the project corridor, includes new sidewalk from 3rd Ave. SW to 5th Ave. Minnesota Department of Transportation - District 3 capital budget fy 2025 -2029 CIP ____________________________________________________________________________________ https://www.hometownsource.com/union_times/free/highway-23-construction-between-milaca-and-ogilvie-starting-in-may/article_e5a44400-e14b-11ee-a830-cf9cbedb22e8.html MnDOT will resurface and improve 12 miles of Highway 23 from Milaca to east of Ogilvie, which includes shoulders, underground drainage structures and updates to access. It will be on Highway 23 from east of Mille Lacs County Road 2/105th Ave. in Milaca to the Groundhouse River east of Ogilvie, Kanabec County. The project will require detours and is expected to begin in mid-May until late October 2024. Summary of work - Resurface (asphalt) road and shoulders - Update access: *Realign 100th Ave./Mille Lacs County Road 101 east of Milaca and install left turn lanes on Highway 23 *Install left turn lanes on Highway 23 at 90th Ave./Mille Lacs County Road 144 - Replace three drainage structures: *Pipe between 78th Ave. and 165th St., west of Bock *Box bridge east of Cable St./Kanabec County Road 52, east of Bock *Box bridge at South Fork Groundhouse River between 50th Ave. and Bear St., east of Bock Traffic plans Overall motorists will encounter: - Lane closures, alternate one-way traffic, flaggers, pilot car - Reduced speed limit - Detours to replace drainage structures: *Milaca to Bock detour: Mille Lacs County Road 2, County Road 4 and County Roaf 1 (about 9 weeks) *Bock to Ogilvie: Mille Lacs County Road 24, Kanabec County Road 26 and Highway 47 (about 6 weeks) - Access will be open to those who live, work or visit those along the work zone; however, expect changes and use of alternate accesses ________________ Highway 23 construction between Milaca and Ogilvie starting in May Minnesota Department of Transportation2 hrs ago 0 MnDOT will resurface and improve 12 miles of Highway 23 from Milaca to east of Ogilvie, which includes shoulders, underground drainage structu…
Conceptual
Roads / Highways
$19,800,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
MN-23, Milaca, MN
Related To This Project
Milaca, MN
Bid Date: Dec 09 2025
Milaca, MN
Bid Date: Dec 03 2025
Milaca, MN
Bid Date: Jan 12 2026
Milaca, MN
Bid Date: Mar 16 2026
Milaca, MN
Bid Date: Apr 03 2026
Milaca, MN
Bid Date: Jul 10 2025
Milaca, MN
Bid Date: Jun 24 2025
Milaca, MN
Bid Date: May 26 2025
Milaca, MN
--
Milaca, MN
--
Milaca, MN
Bid Date: May 05 2025
Milaca, MN
Bid Date: May 05 2025
Milaca, MN
Bid Date: Mar 17 2025
Milaca, MN
Bid Date: Mar 17 2025
Milaca, MN
Bid Date: Jan 23 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
