BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2024 at 8:00 PM

Updated April 27, 2024

Site work and paving for a mixed-use development in Superior, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

In general, the work consists of: Mill and overlay parking lot with 4 inches of bituminous pavement in 2 lifts, remove and replace curb and gutter, remove and replace concrete loading dock, stripe lot, grade and restore grass swales around perimeter of parking lot, and salvage and reinstall chain link fence.

Bid Results

Roads / Highways

$312,043.00

Public - State/Provincial

Paving, Site Work

9

14

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
24
Bidding Soon
259
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 16, 2024

Project location map

801 N 28th St, Superior, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.