BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2024 at 8:00 PM

Updated April 18, 2024

Site work and paving for a road / highway in Belleville, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

following Work: The Village of Belleville plans to mill and overlay a 2.00-inch asphalt lift along Fifth Avenue beginning just East of WI-69 (River St) and extending East to the terminus of Fifth Avenue. The milling will reshape the roadway in order to crown the roadway. The shoulder will be top dressed with approximately 18 inches (width) of gravel. Question Deadline 03/29/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. MSA Professional Services, Kevin Lord, 608-242-661 Questions received less than seven days prior to the date for opening of Bids may not be answered. The anticipated substantial completion date is August 30, 2024 and the final completion date is September 13, 2024. However work is anticipated to be completed within 4 weeks once work commences at the site. a certified check or bid bond equal to at least 5% of the amount bid, Owner reserves the right to waive any informalities or to reject any or all bids.

Award

Roads / Highways

$57,968.00

Public - City

Paving, Site Work

6

13

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
413
Active Projects
224
Bidding Soon
1,632
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

May 6, 2024

Project location map

5th Ave, Belleville, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.