Site work and paving for a mixed-use development in Belleville, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Description: The Project includes the following Work: The Village of Belleville is completing roadway improvements along STH 69 for a new intersection with Tyler Street. Work includes storm sewer installation, pedestrian path installation, and turning lane improvements, concrete curb and gutter, signing and pavement marking. Work is being included for a subdivision currently under construction. Additional work for the extension of Bell West Boulevard is included within the overall scope of this project. Work along Bell West Boulevard includes the topsoil stripping, roadway base construction, installation of concrete sidewalk, concrete curb and gutter, asphalt pavement, sanitary sewer, and water laterals. Work is included for the project to add pavement patches along STH 69 at the northerly end of the Village. The pavement patches will be extensions to the paved shoulders along the STH. The pavement patches will include the base preparation and paving around existing water valves to protect them from maintenance along the STH 69. The anticipated substantial completion date is October 10, 2025 and final completion date is October 24, 2025. Additional Description: No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. Owner reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Village of Belleville.

Conceptual

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
108
Bidding Soon
1,515
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2026

Project location map

STH 69 & Tyler Street, Belleville, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.