Site work and paving for a mixed-use development in Belleville, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.
Park Street, Fourth Street, and Evarts Street Utility and Roadway Improvements The Project includes the following Work: The Village of Belleville is completing roadway improvements along Park Street, Fourth Street, and Evarts Street. The project will consist of watermain replacement along Fourth Street and Evarts Street within the project limits. The watermain trenches will be provided with base material and binder pavement. The remaining roadway will be milled and to provide a complete final lift of asphalt throughout the project extents. The work will consist of watermain construction, pavement sawcutting, roadway base construction, asphalt paving, concrete curb and gutter spot repairs, erosion control, and restoration. The anticipated substantial completion date is August 15, 2025 and the final completion date is August 29, 2025 for the project proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. This project anticipates the use of partial funding from the Wisconsin Department of Transportation Local Road Improvement Program (LRIP). Owner reserves the right to waive any informalities or to reject any or all bids. Question Deadline 04/10/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Kevin Lord, PE, (608) 242-6617 | klord@msa-ps.com
Award
Roads / Highways
$306,793.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
May 19, 2025
Multiple Locations, Belleville, WI
Related To This Project
Belleville, WI
--
Belleville, WI
--
Belleville, WI
--
Belleville, WI
Bid Date: Jul 29 2025
Belleville, WI
--
Belleville, WI
Bid Date: Feb 11 2026
Belleville, WI
Bid Date: Feb 06 2026
Belleville, WI
Bid Date: Apr 14 2025
Belleville, WI
Bid Date: Jun 04 2024
Belleville, WI
Bid Date: Jun 04 2024
Belleville, WI
Bid Date: May 13 2024
Belleville, WI
Bid Date: May 31 2024
Belleville, WI
Bid Date: Apr 05 2024
Belleville, WI
Bid Date: Mar 10 2023
Belleville, WI
Bid Date: May 02 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.