BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in West Milford, New Jersey. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Transient Apron Reconstruction (Phase 2) at Greenwood Lake Airport, West Milford Township, Passaic County, New Jersey; Federal Project No: FAA Funded Project, UPC No: N/A, PE No: N/A, CE No: 7015330 Approximate Construction Start: Spring 2025 DBE/ESBE Goals for this Project 0% Contractors Prequalified in one of these Work Types are eligible to bid this project: 2, 2b, 3, 3a or 5 Greenwood Lake Airport's transient apron pavements are not in great condition. The pavements contain longitudinal and transverse cracks. Under this project almost half the transient apron will be reconstructed. This project will include full pavement replacement, correcting the areas where maximum allowable slopes are exceeded, replacement of the sub-base to a material and thickness that would provide adequate drainage to prevent frost heave cracking. Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d) Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning the Contract to Section 108_prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33 A voluntary Pre-Bid meeting will be held for this project on March 22, 2024, at 11:00 AM. Attendance is strongly encouraged. The meeting will be held at Greenwood Lake Airport, New Jersey. If you are interested in attending this meeting, please e-mail your reply (the preferred method) or contact the office listed below by phone by March 21, 2024. Please indicate the name of your firm and the number of people who will attend this meeting with your reply. Kimbrali Davis, Manager ATTENTION: Shadman Mohammad 1035 Parkway Avenue P.O. Box 600 Trenton, NJ 08625 Tel. No. 609-963-2095 E-mail address: Shadman.Mohammad@dot.nj.gov NJDOT: 462 - Transient Apron Reconstruction (Phase 2) at Greenwood Lake Airport

Award

Transportation Terminals

$739,655.00

Public - State/Provincial

Paving, Site Work

17

12

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
220
Bidding Soon
4,188
All Active Projects
1,946
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

March 20, 2025

img_map_placeholder

126 Airport Rd, West Milford, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.