BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2024 at 8:00 PM

Updated April 16, 2024

Site work and paving for a mixed-use development in Cottonwood Heights, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Notice is hereby given that the CITY OF COTTONWOOD HEIGHTS (OWNER) will accept bids for the construction of the 1700 EAST IMPROVEMENTS AND FORT UNION BIKE PATH according to Drawings and Specifications prepared by the ENGINEER, and described in general as: The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for the construction of the below described project, located in Cottonwood Heights. Schedule A: 1700 East Improvements Work for roadway improvement project consists of the following items of work: mobilization, traffic control, and maintenance of traffic; reconstruction of miscellaneous structures to grade; relocation of water services, mailboxes, gates, signs, walls and any such miscellaneous structures conflicting with the improvements; all required earthwork; construction/reconstruction of curb and gutter, sidewalks, driveway approaches, ADA access ramps; rotomilling and/or asphalt removal of existing pavement; placing and compacting new asphalt surface course; placing of tack coat and pavement reinforcement fabric; traffic paint striping, messages; and all appurtenant work; all in accordance with Drawings and Specifications prepared by the Engineer. Schedule B and Schedule C: Fort Union Bike Path Work for bike path improvement project consists of the following items of work: mobilization, traffic control, and maintenance of traffic; reconstruction of miscellaneous structures to grade; removal of storm drain structures, and any such miscellaneous structures conflicting with the improvements; all required earthwork; construction/reconstruction of curb and gutter, sidewalks, driveway approaches, driveways, ADA access ramps; storm drain structures and piping, utility coordination/relocation, asphalt removal of existing pavement; placing and compacting new asphalt surface course; placing of tack coat and; replacing traffic paint striping, messages; and all appurtenant work; all in accordance with Drawings and Specifications prepared by the Engineer. Bid security in the amount of 5% of the base bid will be required to accompany bids. All questions relative to the project shall be submitted via email to Ben Nelsen at BNelsen@ch.utah.gov The OWNER reserves the right to reject any or all bids; or to accept or reject the whole or any part of any bid; or to waive any informality or technicality in any bid in the best interest of the City. Only bids giving a firm quotation properly signed will be accepted. All questions relative to the project shall be submitted via email to Ben Nelsen at BNelsen@ch.utah.gov

Bid Results

Roads / Highways

$1,096,230.00

Public - City

Paving, Site Work

39

13

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
60
Bidding Soon
1,019
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 6, 2024

Project location map

Multiple Locations, Cottonwood Heights, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.