BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2024 at 8:00 PM

Updated May 9, 2024

Remodeling of an educational facility in Orem, Utah. Completed plans call for the remodel of a 272-square-foot, three-story above grade educational facility.

Dfcm construction pre-qualified general contractors uvu ba restroom remodel. Only firms pre-qualified during stage I of the rfs are allowed to bid on this project. This project is the remodeling of two spaces. One is an existing restroom and one is turning a space into a restroom. The base bid shall include all work and materials associated with this project as outlined in the plans and specifications. This work needs to be completed during the Summer Break 2024 which is May 9th through August 12th. Construction Cost Estimate: $90,000.00 Question Deadline 04/02/2024 at 3:00 PM MT at Utah Public Procurement Place (U3P)

Bid Results

Educational

$135,165.00

Public - State/Provincial

Remodeling

13

21

4

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
106
Bidding Soon
949
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

May 9, 2024

Project location map

936 S 400 W, Orem, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.