Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Casco, Michigan. Completed plans call for the renovation of a educational facility.
Any questions regarding the bid documents should be directed to the Anchor Bay School District Maintenance Department at (586) 716-3622. SCOPE OF WORK Take over existing equipment with Automated Logic DDC controls. Anchor Bay has an unlimited license for ALC. Scope of work in scheduled in phases. Phase 1A: Air handler #3 serves A & D halls with 7 zones with space temperature Timeline: To be completed by June 30, 2024 AHU3 o Mount panel o Build panel & mount controllers o Controls installation of devices, valves, actuators. o Wire controllers using existing control wiring at existing control panel (extend in new panel where necessary) o Install communication wire o Tap existing network o Mount new transformers on side of new panel, pull transformer wiring from existing transformer box o Install new space sensors (reuse existing space sensor wiring and location) o Provide labor and material for the above scope Phase 1B: VUVs for Classrooms A120, A126, D123, D108, D112 (qty 5) Timeline: To be completed July 1, 2024- August 1, 2024 o Controls installation of devices, valves, actuators. o Wire controllers using existing control wiring at existing control panel (extend in new panel where necessary) o Install communication wire o Tap existing network o Mount new transformers on side of new panel, pull transformer wiring from existing transformer box o Install new space sensors (reuse existing space sensor wiring and location) o Provide labor and material for the above scope Phase 2: Air handler 1 serves Media North & South with 5 zones & space temperatures Timeline: To be determined o Mount panel o Build panel & mount controllers o Controls installation of devices, valves, actuators. o Wire controllers using existing control wiring at existing control panel (extend in new panel where necessary) o Install communication wire o Tap existing network o Mount new transformers on side of new panel, pull transformer wiring from existing transformer box o Install new space sensors (reuse existing space sensor wiring and location) o Provide labor and material for the above scope Phase 3: Air handler 2 serves Administration and Principals with 5 zones Timeline: To be determined o Mount panel o Build panel & mount controllers o Controls installation of devices, valves, actuators. o Wire controllers using existing control wiring at existing control panel (extend in new panel where necessary) o Install communication wire o Tap existing network o Mount new transformers on side of new panel, pull transformer wiring from existing transformer box o Install new space sensors (reuse existing space sensor wiring and location) o Provide labor and material for the above scope Additional to be included in Scope o Commissioning o Connect to existing ALC server and software current version 8.0 o Extend existing web-based Automated Logic WebCTRL Graphical User Interface (GUI) software. Provide all programming, database configuration, and graphics for GUI. Verify proper operation of system inputs, outputs, and sequences. o Floor Plan graphic changes/additions o Properly and accurately label all new equipment o Training up to 8 hours o Price to include a one (1) year warranty on all parts and labor o Price to include demo/removal of existing controllers and panels
Post-Bid
Educational
$515,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 5, 2024
May 6, 2024
5201 County Line Rd, Casco, MI
Related To This Project
Casco, MI
Bid Date: May 02 2024
Casco, MI
Bid Date: Jul 12 2024
Casco, MI
Bid Date: Nov 05 2024
Casco, MI
Bid Date: Dec 06 2024
Casco, MI
Bid Date: Dec 21 2021
Casco, MI
Bid Date: Jul 21 2023
Casco, MI
Bid Date: Jul 11 2023
Casco, MI
Bid Date: May 17 2023
Casco, MI
Bid Date: May 05 2023
Casco, MI
Bid Date: Apr 07 2023
Casco, MI
Bid Date: Mar 14 2023
Casco, MI
Bid Date: Mar 02 2023
Casco, MI
Bid Date: Apr 18 2022
Casco, MI
Bid Date: Dec 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.