BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Casco, Michigan. Completed plans call for the renovation of a educational facility.

Any questions regarding the bid documents should be directed to the Anchor Bay School District Maintenance Department at (586) 716-3622. SCOPE OF WORK Take over existing equipment with Automated Logic DDC controls. Anchor Bay has an unlimited license for ALC. Scope of work in scheduled in phases. Phase 1A: Air handler #3 serves A & D halls with 7 zones with space temperature Timeline: To be completed by June 30, 2024 AHU3 o Mount panel o Build panel & mount controllers o Controls installation of devices, valves, actuators. o Wire controllers using existing control wiring at existing control panel (extend in new panel where necessary) o Install communication wire o Tap existing network o Mount new transformers on side of new panel, pull transformer wiring from existing transformer box o Install new space sensors (reuse existing space sensor wiring and location) o Provide labor and material for the above scope Phase 1B: VUVs for Classrooms A120, A126, D123, D108, D112 (qty 5) Timeline: To be completed July 1, 2024- August 1, 2024 o Controls installation of devices, valves, actuators. o Wire controllers using existing control wiring at existing control panel (extend in new panel where necessary) o Install communication wire o Tap existing network o Mount new transformers on side of new panel, pull transformer wiring from existing transformer box o Install new space sensors (reuse existing space sensor wiring and location) o Provide labor and material for the above scope Phase 2: Air handler 1 serves Media North & South with 5 zones & space temperatures Timeline: To be determined o Mount panel o Build panel & mount controllers o Controls installation of devices, valves, actuators. o Wire controllers using existing control wiring at existing control panel (extend in new panel where necessary) o Install communication wire o Tap existing network o Mount new transformers on side of new panel, pull transformer wiring from existing transformer box o Install new space sensors (reuse existing space sensor wiring and location) o Provide labor and material for the above scope Phase 3: Air handler 2 serves Administration and Principals with 5 zones Timeline: To be determined o Mount panel o Build panel & mount controllers o Controls installation of devices, valves, actuators. o Wire controllers using existing control wiring at existing control panel (extend in new panel where necessary) o Install communication wire o Tap existing network o Mount new transformers on side of new panel, pull transformer wiring from existing transformer box o Install new space sensors (reuse existing space sensor wiring and location) o Provide labor and material for the above scope Additional to be included in Scope o Commissioning o Connect to existing ALC server and software current version 8.0 o Extend existing web-based Automated Logic WebCTRL Graphical User Interface (GUI) software. Provide all programming, database configuration, and graphics for GUI. Verify proper operation of system inputs, outputs, and sequences. o Floor Plan graphic changes/additions o Properly and accurately label all new equipment o Training up to 8 hours o Price to include a one (1) year warranty on all parts and labor o Price to include demo/removal of existing controllers and panels

Post-Bid

Educational

$515,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
72
Bidding Soon
1,281
All Active Projects
570
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

May 6, 2024

img_map_placeholder

5201 County Line Rd, Casco, MI

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.