BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Thornton, Colorado. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Update: https://www.thorntonco.gov/media/file/2024-five-year-capital-improvement-plan This project includes the design to reconstruct sidewalks, close sidewalk gaps, add bicycle facilities, and add traffic calming along 124th Avenue between Claude Court and Colorado Boulevard. The project also includes construction of phases 1 and 2 of the project. Phase 1 consists of sidewalk reconstruction, bicycle facilities, and traffic calming in the York Street to Fillmore Street segment. Phase 2 consists of right-ofway and construction for traffic calming at the York Street intersection Project is included City of Thornton Fiscal Year 2024-2028 Page no 37 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Reference Number 0000346635 Delivery Point: Thornton Purchase Type: One Time Only- Delivery Date: 04/29/2024 Project consists of public outreach, engineering design, and environmental study and clearances for the phased construction and modification of existing and new pedestrian and bicycle infrastructure and traffic calming elements on 124th Avenue between Claude Court and Colorado Boulevard. Question Deadline 04/03/2024 at 5:00 PM MT Questions are submitted online No, All questions shall be directed in writing to Keith Griess, Contract Administrator, 9500 Civic Center Drive, Thornton, CO 80229-4326, fax - 303-538-7556, or e-mail Keith.griess@ThorntonCo.gov, The DBE goal for this Project is two percent (2.0%). Buyer Preferences, Guidelines & Requirements Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Federally Funded - Insurance Required Thornton reserves the right to reject any and all Proposals, in part or in whole, and to award the Project to the most responsive and responsible firm(s) as deemed in the best interest of Thornton; further, the right is reserved to waive any formalities or informalities contained in said Proposal(s).

Conceptual

Sidewalks / Parking Lot

$6,327,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
36
Bidding Soon
932
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

img_map_placeholder

E 124th Ave, Thornton, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.