BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Irma, Wisconsin. Completed plans call for the renovation of a educational facility.

In general, the work consists of: Work in two buildings on the Lincoln Hills & Copper Lake School Campus. The Main Administration Building work includes new hollow metal door and frames and replacing a hinged door with a coiling door. The Classroom Building work includes new hollow metal doors and frames, replacement of panels and controls in overhead doors, and replacement of a hinged door with an overhead door. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website. DFD Contractor Certification page: electronically or upon request from DFD--email dfdcertification@wisconsin.gov. CLASS 1 NOTICE: Notice is hereby given in accordance with Section 16.855(10), Wisconsin Statutes, that the Division believes it is in the best interests of the State to contract the following work from only one source, without the usual statutory procedures: Section 08 36 13 - Sectional Overhead Doors44 Section 08 71 00 - Door Hardware Bidders may also join the Microsoft Teams meeting via Microsoft Teams: https://teams.microsoft.com/l/meetup-join/19%3ameeting_NmIxOWU2MzEtODJkNi00ZDFiLThiOTYtYTZiMjM0MzNjZDU5%40thread.v2/0context=%7b%22Tid%22%3a%22f4e2d11c-fae4-453b-b6c0-2964663779aa%22%2c%22Oid%22%3a%2216987bcd-db9d-4075-aa58-5b60d229f4e3%22%7d The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. No in-person pre-bid tour will be offered. Bid Guarantee: A bid bond prepared on the Bid Bond Form bound herein, payable to the State in the amount not less than 10% of the maximum bid shall accompany each bid as a guarantee. A bank certified check or a cashier's check may accompany each bid as a guarantee pursuant to Wis. Stat. s. 779.14(1m)(c)2.b. and 779.14(1s). Failure to enter into the contract with the state (including failure to obtain certificate of insurance and separate 100% performance and 100% payment bonds) may result in forfeiture of the Bid Bond. The company issuing the Bonds must be licensed to do business in Wisconsin. Any bid which is not accompanied by a bid guarantee will not be accepted and will not be read at the bid opening. All checks tendered as bid guarantee, except those of the three lowest bidders, will be returned to their makers within three (3) days after bid opening. All such retained checks will be returned immediately upon execution of the contract between the Contractor and the state. The successful Contractor must agree to commence work on or after a date to be specified in a written "Notice to Proceed" and to fully complete all work within 121 consecutive calendar days thereafter. Completion time will be converted to a specific date at the time the "Notice to Proceed" is issued. Refer also to Conditions of the Contract for Simplified Projects, Article entitled "Time for Completion". Start Date (Month/Year) End Date (Month/Year) Schedule Milestones June 2024 June 2024 Mobilization June 2024 August 2024 Door Replacements September 2024 September 2024 Substantial Completion

Post-Bid

Educational

$185,000.00

Public - State/Provincial

Renovation

10

14

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
15
Bidding Soon
554
All Active Projects
116
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 23, 2024

May 23, 2024

September 21, 2024

img_map_placeholder

W4380 Copper Lake Ave, Irma, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.