Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 24, 2025 at 8:00 PM
Updated July 25, 2025
Site work and paving for a bridge / tunnel in Irma, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Solicitation Id: NC-01 The structures need treatment to extend their service lives. Perpetuation project to rehabilitate 11 structures along US 51 in the Towns of Scott, Pine River, Merrill, and Skanawan in Lincoln County. Services include a thin concrete overlay and spot painting on structures B-35-0021 on CTH Q over US51, B-35-0022 US 51 over Wis River, B-35-0026 on US 51 over CN RR, B35-0028 on US 51 over STH 64, B-35-0030 on CTH G over US 51, B-35-0031 on US 51 over Prairie Rvr, B35-0033 On Pope Rd over US 51, B-35-0034 on CTH K over US 51, B35-0036 on US 51 over Center Rd, B-35-0114 on US 51 over CTH S, B35-0115 on CTH S over US 51. Anticipated Construction Cost: $5,000,000-$5,999,999 DBE Goal: DBE Goal in $ 0.00 Anticipated Project Start Date: 12/01/2025 Anticipated Project Completion Date: 11/01/2030 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Perpetuation - Bridge Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Bridges / Tunnels
$5,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
US-51, Irma, WI
Related To This Project
Irma, WI
Bid Date: Oct 14 2025
Irma, WI
Bid Date: Nov 05 2025
Irma, WI
Bid Date: Jun 17 2025
Irma, WI
Bid Date: Jun 08 2021
Irma, WI
Bid Date: Dec 03 2024
Irma, WI
Bid Date: Aug 13 2024
Irma, WI
Bid Date: Apr 23 2024
Irma, WI
Bid Date: Aug 20 2020
Irma, WI
Bid Date: Aug 25 2020
Irma, WI
Bid Date: Aug 25 2020
Irma, WI
Bid Date: Jan 26 2021
Irma, WI
Bid Date: Jan 21 2021
Irma, WI
Bid Date: Jul 13 2023
Irma, WI
Bid Date: Mar 29 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
