BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a transportation facility in South Lake Tahoe, California. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

**As of April 30, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Construction is anticipated to begin anywhere from June, 2024 to September, 2024 Online Q&A Yes Q&A Deadline 04/05/2024 5:00 PM (PDT) 10019637.00.002 Pavement Maintenance (Seal Coat/Crack Seal/Pavement Markings) Work to be performed includes, but is not limited to: rehabilitation of general aviation apron, parallel taxiway, and taxiway connector, including, seal coat, crack seal, and pavement marking. Best Management Practices, compliance with regulatory permits, and all other work as described in the Contract Documents, including, without limitation, project construction drawings, bid documents, the General Provisions (FAA), the Special Provisions, City of South Lake Tahoe Public Improvements and Engineering Standards, 2023 edition of the California Department of Transportation, Standard Specifications, and the Federal Aviation Administration Advisory Circular 150/5370-10H, Standards for Specifying Construction of Airports. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 15 Working Days The estimated construction cost for the Base Bid Schedule (Schedules I and II) of Work is in the range of: ($900,000 to $1,400,000). Bid Result. Schedule I:Maxwell Asphalt Inc $310,250.00 Schedule II:Maxwell Asphalt Inc $270,510.00 Schedule III:Maxwell Asphalt Inc $47,000.00 Schedule IV:Maxwell Asphalt Inc $45,000.00

Bid Results

Transportation Terminals

$672,760.00

Public - City

Paving, Site Work

34

13

12

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
43
Bidding Soon
527
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

June 10, 2024

img_map_placeholder

1901 Airport Rd, South Lake Tahoe, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.