Site work and paving for a road / highway in Harbor Springs, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

** As of May 16, 2024 this project has been awarded to FAHRNER ASPHALT SEALERS, LLC. with an amount of $262,619.40 .** The Emmet County Road Commission, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contact entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Project Information: Job Location: Various Locations (see locations below) Type of Work: Single Chip Seal, Fog Seal and pavement markings A pre-construction meeting will be scheduled by the Emmet County Road Commission prior to project start. All project submittals are to be submitted for review at this meeting. Project Start Date: 10 Days after all Contracts are executed and not before May 16, 2022. Project Completion Date: September 20, 2024 Project Submittals: The following shall be submitted to the Road Commission Engineer for approval prior to project start: 1. Material Source List (MDOT Form 501) 2. Progress Schedule (must be submitted within 5 days of Contract award) Chip Sealing: All application rates, materials and all work for placement shall be done in accordance with the Michigan Department of Transportation 2020 Standard Specification for Construction. All materials shall meet the requirements of the Michigan Department of Transportation Materials Source Guide. Contractor shall protect all castings on the project. The known castings are indicated in the project notes below, however, the Contractor is expected to verify that all castings are protected within the project limits. General Note: All work shall be done in accordance with the Michigan Department of Transportation 2020 Standard Specification for Construction. All materials shall meet the requirements of the Michigan Department of Transportation Materials Source Guide. For protection of underground utilities, and in conformance with Public act 174 of 2014, the contractor shall call MISS DIG a minimum of three full working days, excluding Saturdays, Sundays and Holidays, prior to beginning work in areas where public utilities have not been previously located. All MISS DIG participating members will be thus routinely notified. This does not relieve the Contractor from notifying utility owners who may not participate in the MISS DIG alert system. Description. This work consists of an application of a fog seal. A fog seal is a light application of a slow-setting emulsified asphalt diluted with water. Ensure all work and materials are in accordance with the standard specifications, except as modified herein.

Award

Roads / Highways

$262,619.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
12
Bidding Soon
136
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

May 16, 2024

img_map_placeholder

Multiple Locations, Harbor Springs, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.