Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Western Springs, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
The Village of Western Springs, Illinois ("Requestor") is issuing a Request for Qualifications ("RFQ") from qualified engineering firms to provide Phase III Construction Engineering services related to the Hampton Avenue LAFO Resurfacing ("Project"). The RFQ will follow a qualifications based selection (QBS) process. In order to have your firm's Qualifications considered, they must be submitted in a sealed envelope containing: o Two original copies of the Statement of Qualifications ("SOQ") o One electronic PDF file containing the SOQ as a single file The Village of Western Springs, Illinois ("Requestor") is issuing a Request for Qualifications ("RFQ") from qualified engineering firms to provide Phase III Construction Engineering services related to the Hampton Avenue LAFO Resurfacing ("Project"). The RFQ will follow a qualifications based selection (QBS) process. In order to have your firm's Qualifications considered, they must be submitted in a sealed envelope containing: o Two original copies of the Statement of Qualifications ("SOQ") o One electronic PDF file containing the SOQ as a single file The Village of Western Springs is receiving federal Surface Transportation Program (STP-L) funds, which will be used in funding the roadway construction and engineering services for this Project. Written policies and procedures for QBS as describe herein meet the requirements of 23 CFR 172 and the Brooks Act. 1. Initial Administration - The Village of Western Springs has a Village Engineer/Director of Engineering Services who along with a Staff Engineer currently make up the Engineering Services Department. They are responsible for the QBS procurement, management, and administration for consultant engineering services. 2. Written Policies and Procedures - The Village of Western Springs believes this project's QBS follows the policies and procedures as outline in Section 5-5 of the BLRS Manual, and specifically Section 5-5.06(e); therefore, approval from IDOT is not required for this QBS. 3. Project Description - The Village of Western Springs will use the following five items when developing the project description and may include additional items when unique circumstances exist. Describe in general terms the need, purpose and object of the project; Identify the various project components; Establish the desired timetable for the effort; Identify and expected problems; Determine the total estimated project budget a. Need, purpose, and objective of the Project: Rehabilitate deteriorated pavement: The project involves the resurfacing of Hampton Avenue between US 34 Ogden Avenue and Hillgrove Avenue. b. Summary of project components: -Pavement milling and resurfacing -ADA Curb ramp replacements -Spot curb and gutter repair -Full depth HMA pavement patching c. Project Timetable: The project is currently planned for the August 2024 IDOT letting. We anticipate construction will begin in September 2024. The project is expected to be substantially completed by December 2024. The consultant will be expected to provide a complete job box and assist with any project closeout issues or warranty claims that may occur in 2025. Village rankings of firms is anticipated to be completed no later than April 10, 2024. Negotiation of manhours and cost to be complete in time to submit a draft Phase III engineering agreements to IDOT no later than April 22, 2024 per the IDOT letting schedule. d. Expected Problems: -None anticipated Scope of Work - Phase III engineering shall consist of the necessary construction engineering and inspection services, including attendance of pre-construction and progress meetings, providing full time or part time resident inspection services, assisting with project close out, and preparation of record drawings. The engineer will be responsible for providing material testing services and reports. Assistance, documentation, and compliance IDOT and other regulatory authority may also be required. Quality Assurance (QA) material testing and oversight of the Contractor's Quality Control must be performed by the respondent firm or one of its subconsultants. The firm must also provide all necessary vehicles and equipment to perform the required services. LPC 662 is anticipated to be completed during Phase II engineering and will be provided in the project specifications. A field office will not be provided for in the contract. The Consultant is expected to provide a mobile office. A desk may be available in the Municipal Services department at Village Hall. In the past the Village has allowed a consultant Resident Engineer to use this space but at this time we cannot guarantee it will be available for use. The Project was placed on the Village of Western Springs website on March 15, 2024 and remains available for public viewing through the submittal date of April 1, 2024.
Conceptual
Roads / Highways
$1,156,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
Hampton Ave, Western Springs, IL
Related To This Project
Western Springs, IL
Bid Date: Apr 23 2024
Western Springs, IL
Bid Date: Apr 11 2024
Western Springs, IL
Bid Date: Apr 23 2024
Western Springs, IL
Bid Date: Aug 02 2024
Western Springs, IL
Bid Date: Jul 19 2024
Western Springs, IL
Bid Date: Aug 05 2024
Western Springs, IL
Bid Date: Aug 22 2024
Western Springs, IL
Bid Date: Aug 21 2024
Western Springs, IL
Bid Date: Apr 02 2024
Western Springs, IL
Bid Date: Apr 02 2024
Western Springs, IL
Bid Date: Apr 02 2024
Western Springs, IL
Bid Date: Apr 02 2024
Western Springs, IL
--
Western Springs, IL
Bid Date: Feb 29 2024
Western Springs, IL
Bid Date: May 03 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.