BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2024 at 8:00 PM

Updated April 30, 2024

Site work and paving for a mixed-use development in Mountain Top, Pennsylvania. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of April 29, 2024 bids for this project has been rejected. As of this time it is unknown if and when project will rebid The work includes but is not limited to all labor, materials, tools, oversight and permits required to reconstruct the road, with new fulldepth asphalt pavement, including the installation of new walkways, and/or replace existing walkways, installation of new stormwater conveyance features, trench restoration, E&S controls, new waterline piping, PennDOT Highway Occupancy upgrades, ADA compliant walkways, pavement markings and maintenance and protection of traffic. The Wright Township reserves the right to accept or reject any or all bids or portions or to waive any informalities in bidding and to withhold award for a period of sixty days. Question Deadline 03/29/2024 at 4:00 PM ET, Questions may be submitted through online, Responses will be provided via online to all registered parties. An addendum will be issued on Tuesday April 2, 2024. Installation shall include all excavation and formwork required, proper disposal of debris, purchase and installation of Segmental Block Wall approximately 2ft High, compacted leveling pad, 6" crushed rock base, drain tiles and backfill and compaction as required within disturbed area.

Final Planning

Roads / Highways

$1,083,338.00

Public - City

Paving, Site Work

29

14

6

5

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
383
Active Projects
171
Bidding Soon
1,894
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

October 29, 2024

Project location map

Park Rd, Mountain Top, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.