BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Vista, California. Completed plans call for site work for a water / sewer project.

Emergency Modifications - Buena Outfall Forcemain Phase III Project The Work generally consists of: Installation of appurtenances to an existing wastewater pipeline along Palomar Airport Road between Paseo Del Norte and El Camino Real. The project will relocate five existing air vacuum relief valves from within manholes in center westbound lane of Palomar Airport Road to above ground locations. The work includes modifications to raise three (3) air vacuum valves and construct dual air vacuum assemblies at grade, and two (2) modifications to raise single air vacuum valves with reconstruction at grade, with one (1) new addition of a dual air vacuum valve to grade by way of modification within an existing gravity manhole with improvements to couple and construct a continuous pressurized pipeline segment, and installation of one (1) new single air vacuum valve in a unimproved easement area northeast of Palomar Airport Road and El Camino Real. The work also includes modifications to convert fifteen (15) gravity pipeline segments within manholes to segments of continuous pressure pipeline at various locations along the alignment and includes mechanical and electrical improvements to protect two existing Odor Control Units from flooding when the system experiences higher flows in winter wet weather periods. The construction includes but is not limited to the above noted improvements in addition to asphalt and portland cement concrete removals, trenching, excavation, over-excavation, backfilling and compaction, pipeline modifications, mechanical piping, appurtenance installation, installation of electrical systems, restoration of existing surface improvements, irrigation, and erosion control and BMPs. An existing pipeline is available for bypassing the full flow during the project construction and no flow diversions or bypass pumping is required by the contractor to execute the work. Question Submission Deadline: April 11, 2024, 2:00pm

Post-Bid

Water / Sewer

$1,500,000.00

Public - City

Site Work

54

12

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
100
Bidding Soon
2,248
All Active Projects
1,030
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

June 17, 2024

img_map_placeholder

Multiple Locations, Vista, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.