BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Aspen, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000346104 Install storm main and associated collection system, water quality treatment system, and outfall into Roaring Fork River. The only stormwater management systems that currently existing in the vicinity are a failing drywell (proposed to be removed) and private systems on private property. Improve pedestrian connectivity by completing a sidewalk connection along the east side of Park Avenue and re-aligning the roadway towards the west to accommodate the proposed sidewalk. Park Avenue and E Hopkins Storm System: Install approximately 550 of stormpipe ranging in size from 18 in diameter up to 24x36 elliptical pipe beneath the ROW of the northern block of Park Avenue and beneath the E Hopkins Trail. Install water quality treatment vault beneath E Hopkins Trail for water quality treatment. Grade outfall swale and install rip rap for the outfall into the Roaring Fork River. Park Avenue Sidewalk Installation and Roadway Re-alignment: Install new sidewalk to complete a sidewalk connection of approximately 150 ft on the east side of the northern block of Park Avenue. Install curb and gutter along the length of the new sidewalk and re-align the roadway towards the west along approximately the same length to accommodate the new sidewalk. E Hopkins Trail Re-alignment: Reinstall the E Hopkins Trail with the proposed grading to ensure surface drainage drains positively away from the trail. Question Deadline 04/18/2024 at 11:59 PM MT Questions are submitted online Yes, Questions must be posted on the website. All work shall be completed by October 31st, 2024. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % The City reserves the right to reject any or all bids or accept what is, in its judgment, the bid which is in the City's best interest. The City further reserves the right, in the best interests of the City, to accept a late submittal or to waive any technical defects or irregularities in any and all bids submitted. The City cannot accept faxed or emailed bids.

Post-Bid

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

21

15

14

8

Subscribe For Documents

118 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
5
Bidding Soon
119
All Active Projects
50
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.