BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in Lincolnton, North Carolina. Completed plans call for the renovation of a multi-residential development.

Per Addendum 2 - Project is Rebidding Furnishing of labor, material and equipment entering into the Modernization of Project NC 70-2, SITE #5. Scope of work will consist of renovations and modernization of existing project and includes, but is not limited to, the following items: Project anticipates renovations to 60 residential bathrooms. Remove and replace existing vanity top and base cabinet, faucet, supplies, trap & supply stops. Remove and replace existing waste pipe from fixtures to existing vertical waste stack pipe. Remove and replace existing water closet (there are existing American Standard Champion Water Closets that were installed in the past at various apartments. If they are found to be in good working order they are to be re-used. The new water closets are to be turned over to the Owner for their stock inventory), supply, supply stop, wax ring & closet bolts. Remove & replace existing cast iron closet flange & waste pipe back to existing vertical waste stack pipe. Remove and replace existing tub, tub surround panels, gyp. bd. at tub/shower walls. Remove and replace faucet set, spout, shower head & drain. Remove and replace waste piping back to vertical waste stack pipe. Remove existing flooring, wall base, marble or aluminum threshold & plywood underlayment down to existing subfloor. Inspect existing subfloor and floor framing and replace any damaged areas. (See Unit Pricing). Provide new 1/4" floor underlayment with new water proofing membrane that carries up perimeter walls 3" min., Provide new porcelain floor tile - Base Bid (See flooring notes on Sheet A1.1 for list of flooring alternates) with new 4" PVC base board with PVC shoe mold set in bead of sealant. Prime & paint new base board. Patch & paint all damaged existing gyp. bd. walls & ceiling. Provide like new finish to all exposed drywall surfaces. Remove & replace existing medicine cabinets. Remove & replace existing ceiling mechanical air supply grilles with new aluminum grilles. Remove existing ceiling exhaust fan face plate. Vacuum interior of exhaust fan. Clean face plate and reinstall. Paint all walls & ceiling of bathroom. Protect existing door and door frame from damage. Protect all existing fixtures that are to remain from being painted. Remove and replace existing chair rail trim. New chair rail trim to carry around full perimeter of bathroom and terminate at new tub surround. Provide new FRP wainscot panels and trims below existing wood chair rail to floor. All other work as shown on plans, in the Project Manual and as required by building code and authority having jurisdiction. Questions that arise from the Site Visits are to be directed to the Architect at bids@stognerarchitecture.com. Complete Plans and Project Manual will be open for inspection in the office of Stogner Architecture, PA, 615 East Broad Avenue, Rockingham, North Carolina (Designer); at the Housing Authority Office Complete Plans and Project Manual may be obtained online from Stogner Architecture, PA. by qualified bidders. For instructions on downloading these documents email bids@stognerarchitecture.com All contractors are hereby notified that they must have proper license under the State laws governing their respective trades, whether or not Federal Funding is involved. North Carolina's Permanent Rules for the Lead Based Paint Hazard Management Program for Renovation, Repair and Painting (LHMP-RRP); 10A NCAC 41C.0900, became effective 11-01-2010. These rules and the associated General Statutes REQUIRE Certification of Prime Contractor, Renovators, Dust Sampling Technicians and firms conducting renovation, repair and painting for compensation that disturbs lead based paint in housing or child occupied facilities built before 1978. The Buildings in this contract have a (DOFA) Date of First Availability of: NC 70-2: 09/30/1973 The Buildings in this contract have not been tested in accordance with North Carolina's LHMP-RRP rules; This Contract Anticipates a disturbance of the minimum amount of painted surfaces and based on the RRP Rules the Prime Contractor is REQUIRED to be Certified prior to Bidding or the Bid will be rejected. TEST PRIOR TO JULY 1997 DO NOT COMPLY WITH NC RULES. Provide a Copy of Prime Bidder's Firm Certification; CERTIFICATION must be by State of North Carolina (NOTE: EPA Certification is not accepted in North Carolina). Contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina will be observed in receiving and awarding Contracts. Contractors will be responsible to ensure that economic opportunities, to the greatest extent feasible follow Section 3 Requirements 24 CFR Part 135.1 and Section 3 Clause 24 CFR Part 135.38. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina and per Section 9 of Form 5369 and individual sureties must be listed on US Treasury Circular Number 570 to execute the contract in accordance with the bid bond and per HUD-5369 Sections 9 and 10. Five Percent shall be based on the maximum bid price, ie: Base Bid plus Unit Prices plus Contingency Allowance plus All Add Alternates. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten (10) days after the award or to give satisfactory surety as required by law. (Bid Bond not required if bid is less than $100,000.00.) Refer to provisions for Equal Employment Opportunity and payment of not less than the minimum salaries and wages indicated in the project manual must be paid on this project. A Performance Bond and a Payment Bond will be required for one hundred percent (100%) o/f the contract price. Performance and Payment Bond not required if Bid is less than $100,000.00. Payment will be made on the basis of ninety percent (90%) of monthly estimates and final payment made upon completion and acceptance of work. Bid Opening: Bids will be opened and read from the Stogner Architecture, PA office. All bidders may attend the Bid Opening in person, or virtually via Audio and/or Visual Conferencing through the Zoom Video Conferencing platform. The Bid Date and Time will be enforced and the Zoom Meeting will start exactly on time. For instructions on how to use Zoom to access the Virtual Public Bid Opening, please refer to Additional Instructions to Bidders, HUD-5369, Item 26. Bid Delivery Methods: Bids may be delivered by one of the following methods: 1. Bids may be dropped off at the office of the Architect: Stogner Architecture, PA 615 East Broad Avenue Rockingham, NC 28379 Attention: David Stogner 2. Bids may be sent to the office of the Architect by United States Postal Service Express Mail Next Day Service per HUD 5369, Page 204, Section 5.3. Pay attention to the time that it must be sent in order to reach the Stogner Architecture office before the Bid Date and Time - overnight delivery to Rockingham is not guaranteed by all delivery companies and the delivery timeframe varies based on the location of origin. Equal service by FedEx or UPS will be accepted. 3. Bids may be sent by Registered or Certified Mail as spelled out in the Notice to Bidders, HUD-5369, Page 2 of 4, Section 5.1. Please pay attention to timing. 4. Bids may be sent electronically and uploaded to a Secure File Sharing System called Sharefile per the Notice to Bidders, HUD 5369, Page 2 of 4, Section 5.2, by Bidders who follow the instructions below. Bidders who wish to submit their bid electronically may upload their Entire Bid Package to the Stogner Architecture Sharefile by Citrix Account. Electronic Upload to the Stogner Architecture Sharefile account is the only approved method of electronic Bid Package Submission. Bid uploads will automatically be time- and date-stamped as they are loaded into the Sharefile accounts. Bids will not be viewed by anyone prior to the Bid Opening Date and Time. Bids will be viewed electronically after the Bid Opening Date and Time. Bids will automatically be time- and date-stamped each time a party views the files. This will ensure that bids will be considered "sealed" until after the bid receipt date and time. The Viewing log can be made available to bidders upon request. This process basically requires uploading a file to a secure server. Bidders who choose this method must begin the process early enough so that the files are received, not just sent, no later than the Bid Date and Time.Keep in mind that large files may take longer to upload. Additionally, bidders who choose to scan / convert their bids into an electronic file should double check the electronic file prior to upload to ensure that papers did not "stick together" or "go missing" or other during your scanning process. Bidders will not be able to claim that a portion "did not scan" or "are missing" as an excuse for missing documents. Late bids due to "internet outages", "slow internet", etc will not be accepted. Emailed/Faxed bids will not be accepted. These methods of transmission have limitations that make it more difficult to guarantee that a bid package has not been opened before the set bid date and time. 5. The Lincolnton Housing Authority is authorizing this method as a onetime method, and this procedure may not be an option for future bids. Bid should be sent early enough so that it is actually received, not just sent, no later than the Bid Date and Time. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of Sixty (60) days. The Owner reserves the right to reject any or all bids and to waive informalities.

Post-Bid

Multi-Residential

$300,000.00

Public - City

Renovation

9

21

8

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
49
Bidding Soon
1,112
All Active Projects
453
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Lincolnton, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.