BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Flowood, Mississippi. Completed plans call for site work for a water / sewer project.

Construction services for shoreline stabilization project. The subject requirement consists of all labor, materials, equipment, and supervision to stabilize the shoreline, reduce or eliminate erosion, provide for public use where it is compatible with th5 - at purpose and enhance aquatic and terrestrial habitats where possible. The base requirement consists of upland site work including site clearing, excavation and fill placement, construction of a terraced wall with the upper wall being a large block gravity wall (Redi-Rock block wall or approved engineer equivalent) and the lower wall being an anchored sheet pile wall. The project also includes terraced walls, a lower retaining wall, mid-level terrace, vegetation, and sediment management. Five other optional projects are included in this requirement, and the government anticipates funding for exercise of those options. Magnitude of Construction: Over $10M Site Visit: June 18, 2024 / 9AM Local Florida Time (See clause instructions below / FAR 52.236-27) Questions Due Date: June 24, 2024 / 2:00 PM Mountain Time Period of Performance: 08/01/2024 to 03/30/2026 Period of Performance: 09/20/2024 to 04/28/2026 FAR Magnitude: Over $10M NAICS: 237990 SIZE STD: $45M SET-ASIDE: Total Small Business Attached questions and answers are provided along with a due date of August 1, 2024 at 12:00 noon MDT, for any second round questions

GC Bidding

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

29

17

76

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
11
Bidding Soon
220
All Active Projects
91
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2024

September 20, 2024

img_map_placeholder

273 Market St, Flowood, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.