Site work and paving for a civil project in San Diego, California. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.
The Work and Services required of the Design-Builder include those during design and construction of the Project. The Design-Builder shall provide all management, supervision, labor, services, equipment, tools, supplies, temporary facilities, and any other item of every kind and description required for the complete design and construction of the Project. 1. The Design-Builder shall be responsible for performing and completing, and for causing all Sub-consultants/Subcontractors to perform and complete the design and construction of the Project as set forth in the Contract Documents. 2. The Design-Builder shall provide all Work and Services required by the Contract Documents, including those described as "if required," "if directed," "potential, "optional," "may," or similar adjectives and phrases. This work falls under the appropriate proposal items. 3. The Design-Builder covenants that the Services shall meet the performance expectations of the City as described in this Scope. The Design-Builder shall be responsible for achieving Completion of the Project as set forth in the Project Schedule, as the same may be extended from time to time pursuant to the provisions of the Contract. 4. The submission of a Proposal shall be conclusive evidence that the Design-Builder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and scope of Work, the quantities of materials to be furnished, the local conditions under which the Work is to be performed, and as to the requirements of the Proposal Documents, Plans, and Specifications. 5. As the Engineer of Work, the Design-Builder shall refer to the City's preliminary design information for the purpose of preparing a set of Plans and Specifications for the construction. 6. The Scope of Work and Services [Scope] shall also include but is not limited to the following: 7. Conducting investigations and as-built research needed for the completion of design work; 8. Preparing and completing 60%, 100%, and Final design drawings. The Design- Builder is solely responsible for the preparation and completion of design plans for construction; 9. Obtaining approval from the State Water Resources Control Board Division of Drinking Water for water and sewer separation, if required; 10. Obtaining plan check approvals; and providing engineering services during construction, startup, and testing and approval from Department of Public Health for water and sewer separation;2.7.5 Construction of sewer mains, laterals, replumbs, and appurtenances including all work associated; 11. Construction of water mains, services, and appurtenances including all work associated; 12. Construction of rehabilitation of sewer mains and appurtenances including all work associated; 13. Monitoring for potential of any hazardous materials and coordination with local resource agencies; 14. Value engineering; 15. Additional geotechnical investigation and potholing; 16. Performance and implementation of QA/QC; 17. Landscaping and re-vegetation plan, if required; 18. Traffic control, striping, overlay, storm water permitting and compliance; 19. Concrete roads/Alleys shall be restored beyond the edge of the trench cut to the nearest expansion, cold joint, or construction joint. 20. Surface restoration for each phase of the project shall occur at the completion of construction for that phase and not at the end of construction of all phases; 21. Coordinating with the City Project and Construction Managers and other utility owners/contractors; Coordinate utility relocations with utility owners; and 22. Scheduling, community outreach and public relations, and preparation of as built drawings. 23. The Design-Builder shall use CADD in compliance with the City's "Consultant Standards for Preparation of PS&E." 24. The Design-Builder shall use the Prima Type of Award: Lump Sum Estimated Bid Value: $17,700,000.00 Online Q&A: No License Requirements: A or (C-34 and C-42). he City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages: 1. SLBE participation 8.5% 2. ELBE participation 13.8% 3. Total mandatory participation 22.3% This project includes water and sewer facilities identified by the Public Utilities Department as requiring replacement due to age and condition. These replacements will reduce future water and sewer main breaks and reduce maintenance requirements. The project will also bring existing water and sewer mains up to current City Standards. 1.2 The project proposes to replace-in-place via open trench approximately 6,195 linear feet (1.17 miles) of existing 6 and 8-inch asbestos cement (AC) water mains with PVC water mains. The project proposes to construct approximately 770 linear feet (0.15 miles) of new 8-inch water mains via open trench. Approximately 344 linear feet (0.07 miles) of existing water main would be abandoned in City ROW. Water services, fire hydrants, valves, water meters, and other appurtenances are also included with the water improvements. 1.3 The project proposes to replace-in-place via open trench approximately 3,935 linear feet (0.75 miles) of existing 6 and 8-inch vitrified clay (VC) and concrete pipe (CP) sewer mains with PVC sewer mains. The project proposes to construct 3,485 linear feet (0.66 miles) of new 8-inch sewer mains via open trench. The project proposes to rehabilitate 4,973 linear feet (0.94 miles) of existing 6 and 8-inch vitrified clay (VC), cast iron (CI), and concrete pipe (CP) sewer mains. Approximately 3,483 linear feet (0.66 miles) of existing sewer main would be abandoned in City ROW and easements. Six manholes would be abandoned in City ROW. Five manholes would also be abandoned in City easements. Approximately 20 new sewer manholes are proposed in various locations. 19 existing manholes would be replaced-in-place along the project alignment within the paved City right-of-way. 23 existing sewer manholes are proposed to be rehabilitated in various locations within paved City right-of way and in City easements. Approximately 96 new sewer lateral replumbs shall be installed. Project Location-Specific: Proposed work locations at Seminole Drive, Filipo Street, alley west of Filipo Street, Solita Avenue, Aragon Drive, Serrano Place, alley south of El Cajon Boulevard, alley west of Aragon Drive, alley west of Rolando Boulevard, Rolando Boulevard, alley west of Valencia Drive, Valencia Drive, alley north and south of Amherst Street, 67 th Street, Rosefield Drive, 68 th Street, Amherst Street, Eberhart Street, 69 th Place, 70 th Street, Colony Road, 71 st Street. Within the Mid-City: Eastern and College Community Planning Areas (Council District 9). Question Deadline Apr 24, 2024
Post-Bid
Roads / Highways
$17,700,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2024
July 29, 2024
Multiple Locations, San Diego, CA
Related To This Project
As-Needed Fertilizer for City of San Diego Parks and Recreation Department's Golf Division - 5365940
San Diego, CA
Bid Date: Apr 25 2024
San Diego, CA
Bid Date: Apr 04 2024
San Diego, CA
Bid Date: Apr 04 2024
San Diego, CA
Bid Date: Apr 04 2024
San Diego, CA
Bid Date: Apr 04 2024
San Diego, CA
Bid Date: Apr 26 2024
San Diego, CA
--
San Diego, CA
Bid Date: Dec 15 2020
San Diego, CA
Bid Date: Apr 24 2024
San Diego, CA
Bid Date: May 07 2024
San Diego, CA
Bid Date: Apr 16 2024
San Diego, CA
Bid Date: Apr 24 2024
San Diego, CA
Bid Date: Apr 10 2024
San Diego, CA
Bid Date: Mar 29 2024
San Diego, CA
Bid Date: Apr 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.