BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lake Geneva, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work includes furnishing of all materials and equipment and performance of the following work, according to the Plans, Specifications and Contract Documents (PS & CD). The Base Bid work for the above contract includes the following treatments to the respective streets, alleyways, and parking lots: Full Pavement Reconstruction: o Lake Geneva Boat Parking Lot F (at S Lakeshore Dr / Baker St) o Entrance to Gino's Parking Lot (Center St / Wrigley) 2-3 Inch Asphalt Mill and Overlay: o Circle Dr (at Miller Rd) o Pond View Ln (at Dodg-e St) o Dodg-e St (between Pond View Ln / McDonald Rd) o Spring St to Grove Street Alleyway Sidewalk Improvements o Henry St (between Williams St / Center St) o North St (between Warren St / Madison St) o Wells St (between Cass St / Campbell St) Sidewalk New Construction o Baker St (North side, between Lake Shore Dr / Wells St) o Edwards Blvd (West side, between Townline Rd / Park Dr) Trail Repaving o Bike Path Townline Rd (North side, between Hudson Trail / Edwards Blvd) Major work items and approximate quantities include: 1,500 tons HMA Pavement, 7,850 SF of Concrete Sidewalk, 1,500 LF of Concrete Curb & Gutter, 2,500 CY of excavation common / excavation common - EBS, 2,050 TON of Base Aggregate Dense, and 2,250 SY of landscape restoration. These improvements also include clearing & grubbing, driveway replacement, sawing asphalt and concrete, traffic control, pavement markings, and erosion control. Please contact Kapur if you have any questions regarding the project. The Owner reserves the right to reject any or all bids, waive or not waive any informality in the bids received and to accept any proposal, which they deem most favorable to the interests of the Owner. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Sidewalks / Parking Lot

$67,000.00

Public - City

Paving, Site Work

76

12

7

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
123
Bidding Soon
2,069
All Active Projects
866
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

May 13, 2024

img_map_placeholder

Multiple Locations, Lake Geneva, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.