BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2024 at 8:00 PM

Updated July 4, 2024

Site work and paving for a road / highway in Coleman, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Pound is seeking bids for (3) elements of the Belgium Road Project Phase 3. Belgium Project, Phase 3 is approximately 1273 foot long, running north for end of Phase 2 to CTH B. Element (1) is for reconstruction of roadbed to 28 foot wide. Element (2) is for Pulverizing the existing surface. Element (3) is for asphalt (Hot Mix) resurfacing with application in 2024. The Town reserves the right to accept or reject any and all bids and to accept the bid most advantageous to the Town.

Award

Roads / Highways

$438,350.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
53
Bidding Soon
413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

June 13, 2024

Project location map

Belgium Rd, Coleman, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.