Published June 11, 2024 at 8:00 PM

Updated June 12, 2024

Renovation of a multi-residential development in Renton, Washington. Completed plans call for the renovation of a 62,293-square-foot, four-story above grade multi-residential development.

Vantage PointApartments located offthe arterials SE Carr Road/SEPetrovitsky Road and 108th Ave SE, in theBenson HillNeighborhood ofRenton. Vantage Point Community is comprised ofa seniorpopulation with ADA accommodations built in 2015 is afourstory building with 77 units. The building is constructed ofwoodframing over continuous concretefooting stem walls, andwith thefirstfloor being a slab on grade, secondfloor containspost tension decking, and the third andfourthfloor are constructed ofwoodframing. Contractorshallprovide allservices and materials tofurnish and install one (1) ground hydraulic elevator into an existing shaft. Work will include boring new hole for in-ground jack, and complete newjack assembly, casing andpit channels. Scan concrete before boring to confirm existing rebar configuration. Add additional members as necessary to maintain structural integrity ofpit slab. Coat any rebar that is cut or exposed in the boringprocess. Provide electrical components ofthe elevator equipment and systems, including motors, motor starters, controllers, control instruments, switches, conduit, wire, and relays as specified and as necessary for complete operable systems. Openings required in the hoistway shall be completed by drilling or cutting. Vantage Point Apartments located off the arterials SE Carr Road/SE Petrovitsky Road and 108th Ave SE, in the Benson Hill Neighborhood of Renton. Vantage Point Community is comprised of a senior population with ADA accommodations built in 2015 is a four story building with 77 units. The building is constructed of wood framing over continuous concrete footing stem walls, and with the first floor being a slab on grade, second floor contains post tension decking, and the third and fourth floor are constructed of wood framing. Contractor shall provide all services and materials to furnish and install one (1) ground hydraulic elevator into an existing shaft. Work will include boring new hole for in-ground jack, and complete new jack assembly, casing and pit channels. Scan concrete before boring to confirm existing rebar configuration. Add additional members as necessary to maintain structural integrity of pit slab. Coat any rebar that is cut or exposed in the boring process. Amount: Five (5%) Percent of the Total bid must accompany Each Bid greater than one hundred fifty ($150,000) dollars. Payable to: King County Housing Authority Process: Bid Bond or Certified Check will be returned to the Unsuccessful Bidders within Ten (10) Days after the Contract Award

Award

Multi-Residential

$6,000,000.00

Public - County

Renovation

19

21

2

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
89
Bidding Soon
1,753
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

June 24, 2024

Project location map

17901 105th Pl SE, Renton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.