Published June 12, 2024 at 8:00 PM

Updated June 13, 2024

Renovation of an educational facility in Ogden, Utah. Completed plans call for the renovation of a educational facility.

DFCM Division Facilities and Construction and Managment 72120 Nonresidential building construction services including commercial and office building new construction services and construction services and renovation and repair services. Weber State University would like to modernize the mechanical, electrical, and plumbing systems in the building to extend the life of the building for another 30 years. This includes compliance with the University's Master Plan of electrification using hybrid variable refrigerant volume systems (VRF) where applicable to reduce site emissions. This project will combine four fan rooms into two to serve the arena, convert ancillary spaces to VRF, replace plumbing, fire protection, lighting and electrical throughout the building. The University would also like to convert two of the four existing fan rooms into lounges or similar high-value spaces. Additionally, a ground source borefield is expected to be installed as part of the project. Construction Cost Estimate: $18,500,000.00 DFCM is entering into a Multi-Step Bidding Process for Construction Services. A short-listing of Contractors will be based on the evaluation of proposals submitted and the selection criteria outlined in the solicitation documents contained herein. Short-listed Contractors will be invited to submit bids on the project. The only Contractors allowed to bid on this project will be Contractors short-listed by the selection committee. All Contractors responding to this procurement must comply with and require all their Subcontractors to comply with the license laws as required by the State of Utah. For questions regarding this project, please contact Michael Smith | 801-870-3420 | mikesmith@utah.gov. No others are to be contacted regarding this project.

Post-Bid

Educational

$18,500,000.00

Public - State/Provincial

Renovation

144

6

70

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Grouting
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
31
Bidding Soon
649
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

August 5, 2024

img_map_placeholder

4400 Harrison Blvd, Ogden, UT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.