BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Myrtle Beach, South Carolina. Completed plans call for site work for a water / sewer project.

This project consists of removing pumps, chlorinating wells per DHEC regulations, material disposal, and cementing three (3) wells for abandonment City of Myrtle Beach is requesting proposals for a Contractor to provide the required services to abandon three (3) groundwater wells located in Myrtle Beach, South Carolina. The City requires to Cement the Entire Well. Contractor shall pull associated pumps for all wells and dispose of the material. The City will pick up the existing motors from the contractor onsite once they are removed. Well must be properly chlorinated per DHEC regulations prior to abandonment. Well abandonment must be conducted via tremie pipe from bottom of well to surface. Contractor must confirm well information and design. Contractor must clean and dispose of any extra cement onsite created by abandonment process. Pump pedestal foundations can remain. Contractor must confirm proper abandonment to surface. Contractor will be responsible for submitting the appropriate documents and forms including D-1903 to DHEC and the Authority/City of Myrtle Beach when the required well abandonment services are completed. Project Identification: 21stAve North, 38th Ave North and Arcadian Deep Water Well Abandonment 1. Project Location: Three (3) locations within the City of Myrtle Beach: A. 1251 21st Ave North B. 698 38th Ave North C. 9963 Kings Road Question Deadline 04/16/2024 at 5:00 PM ET

Award

Water / Sewer

$100,430.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
74
Bidding Soon
927
All Active Projects
401
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 30, 2024

May 30, 2024

June 29, 2024

img_map_placeholder

Multiple Locations, Myrtle Beach, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.